New modified exponentially weighted moving average-moving average control chart for process monitoring

被引:13
|
作者
Talordphop, Khanittha [1 ]
Sukparungsee, Saowanit [1 ]
Areepong, Yupaporn [1 ]
机构
[1] King Mongkuts Univ Technol North Bangkok, Fac Appl Sci, Dept Appl Stat, Bangkok 10800, Thailand
关键词
Mixed control chart; modified exponentially weighted moving average- moving average control chart; average run length; modified exponentially weighted moving average control chart; moving average control chart; EWMA CONTROL CHARTS; DESIGN;
D O I
10.1080/09540091.2022.2090513
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The mixed control chart is proposed to improve detection performance with fewer process shifts. In this study, we proposed the modified exponentially weighted moving average - moving average control chart (MMEM), a new mixed control chart for observing the changes in the process mean. Average run length, standard deviation of run length, and median run length can be used to examine the effectiveness of detecting changes in the proposed chart with Shewhart, Moving Average (MA), Modified Exponentially Weighted Moving Average (MEWMA), and Mixed Moving Average - Modified Exponentially Weighted Moving Average (MMME) control charts in parametric and nonparametric distributions that use Monte Carlo simulation. The results demonstrate that the proposed chart outperforms other control charts mostly in the detection of small-to-moderate shifts. To illustrate the application of the proposed chart, chemical process temperature data and dataset on survival times of a group of patients suffering from head and neck cancer disease and treated with radiotherapy were provided, and it was discovered that the proposed chart performs better than other control charts.
引用
收藏
页码:1981 / 1998
页数:18
相关论文
共 50 条
  • [1] Performance of new nonparametric Tukey modified exponentially weighted moving average-Moving average control chart
    Talordphop, Khanittha
    Sukparungsee, Saowanit
    Areepong, Yupaporn
    PLOS ONE, 2022, 17 (09):
  • [2] Nonparametric mixed exponentially weighted moving average-moving average control chart
    Raza, Muhammad Ali
    Amin, Azka
    Aslam, Muhammad
    Nawaz, Tahir
    Irfan, Muhammad
    Tariq, Farah
    SCIENTIFIC REPORTS, 2024, 14 (01):
  • [3] Exponentially weighted moving average-Moving average charts for monitoring the process mean
    Sukparungsee, Saowanit
    Areepong, Yupaporn
    Taboran, Rattikarn
    PLOS ONE, 2020, 15 (02):
  • [4] Modified exponentially weighted moving average control chart for monitoring process dispersion
    Rasheed, Zahid
    Zhang, Hongying
    Khan, Majid
    Anwar, Syed Masroor
    COMMUNICATIONS IN STATISTICS-SIMULATION AND COMPUTATION, 2024,
  • [5] A nonparametric mixed exponentially weighted moving average-moving average control chart with an application to gas turbines
    Raza, Muhammad Ali
    Tariq, Farah
    Zaagan, Abdullah A.
    Engmann, Gideon Mensah
    Mahnashi, Ali M.
    Meetei, Mutum Zico
    PLOS ONE, 2024, 19 (08):
  • [6] On designing new mixed modified exponentially weighted moving average- exponentially weighted moving average control chart
    Talordphop, Khanittha
    Sukparungsee, Saowanit
    Areepong, Yupaporn
    RESULTS IN ENGINEERING, 2023, 18
  • [7] A New Exponentially Weighted Moving Average Control Chart for Monitoring the Process Mean
    Haq, Abdul
    Brown, Jennifer
    Moltchanova, Elena
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2015, 31 (08) : 1623 - 1640
  • [8] A New Exponentially Weighted Moving Average Control Chart for Monitoring Process Dispersion
    Haq, Abdul
    Brown, Jennifer
    Moltchanova, Elena
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2015, 31 (08) : 1337 - 1357
  • [9] Mixed Exponentially Weighted Moving Average-Moving Average Control Chart with Application to Combined Cycle Power Plant
    Raza, Muhammad Ali
    Iqbal, Komal
    Aslam, Muhammad
    Nawaz, Tahir
    Bhatti, Sajjad Haider
    Engmann, Gideon Mensah
    SUSTAINABILITY, 2023, 15 (04)