RESOURCE CONSTRAINED PROJECT SCHEDULING WITH MULTIPLE OBJECTIVES - A DECISION SUPPORT APPROACH

被引:10
|
作者
DAVIS, KR [1 ]
STAM, A [1 ]
GRZYBOWSKI, RA [1 ]
机构
[1] UNIV OSNABRUCK,FACHBEREICH WIRTSCHAFTWISSENSCH,W-4500 OSNABRUCK,GERMANY
关键词
D O I
10.1016/0305-0548(92)90035-4
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Over the past 30 years, various formulations of the project scheduling problem have been proposed. Traditionally, the managerial focus of most project scheduling formulations has been on the single objective of minimizing project completion time. Other relevant factors which legitimately should be included as an objective, such as physical, financial, and human resources, have either been assumed to be available in plentiful quantities, or have been accounted for in the form of rigid resource constraints. In this paper, an interactive decision support approach is introduced for explicitly considering multiple factors, simultaneously, in a multiobjective decision making framework. The approach enhances the traditional project scheduling framework in that it allows the decision maker to examine the minimization of project completion time as well as the balancing of available resurces. The approach thus makes the decision process for the project scheduling problem more flexible because various tradeoffs between project completion time and resource requirements can be evaluated. The decision support framework employs an interactive procedure based on vector maximization. Use of the method is illustrated with an example, and results from the example are compared with traditional single objective mathematical programming, preemptive goal programming, and Archemedian goal programming.
引用
收藏
页码:657 / 669
页数:13
相关论文
共 50 条
  • [11] A Concept of Decision Support for Robust Resource-Constrained Scheduling Problems Using Hybrid Approach
    Sitek, Pawel
    Wikarek, Jaroslaw
    [J]. INFORMATION SYSTEMS ARCHITECTURE AND TECHNOLOGY - ISAT 2016 - PT I, 2017, 521 : 67 - 77
  • [12] A Neurogenetic approach for the resource-constrained project scheduling problem
    Agarwal, Anurag
    Colak, Selcuk
    Erenguc, Selcuk
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 44 - 50
  • [13] An evolutionary approach for resource constrained project scheduling with uncertain changes
    Zaman, Forhad
    Elsayed, Saber
    Sarker, Ruhul
    Essam, Daryl
    Coello Coello, Carlos A.
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2021, 125
  • [14] A Tabu Search Approach for the Resource Constrained Project Scheduling Problem
    Paul R. Thomas
    Said Salhi
    [J]. Journal of Heuristics, 1998, 4 : 123 - 139
  • [15] A heuristic approach to fuzzy resource-constrained project scheduling
    Yeh, CH
    Pan, HQ
    Willis, RJ
    [J]. COMPUTATIONAL INTELLIGENCE FOR MODELLING, CONTROL & AUTOMATION - EVOLUTIONARY COMPUTATION & FUZZY LOGIC FOR INTELLIGENT CONTROL, KNOWLEDGE ACQUISITION & INFORMATION RETRIEVAL, 1999, 55 : 423 - 428
  • [16] A tabu search approach for the resource constrained project scheduling problem
    Thomas, PR
    Salhi, S
    [J]. JOURNAL OF HEURISTICS, 1998, 4 (02) : 123 - 139
  • [17] A reactive scheduling approach for the resource-constrained project scheduling problem with dynamic resource disruption
    Xu, Jiaojiao
    Bai, Sijun
    [J]. KYBERNETES, 2024, 53 (06) : 2007 - 2028
  • [18] An ant-based coordination mechanism for resource-constrained project scheduling with multiple agents and cash flow objectives
    Andreas Fink
    Jörg Homberger
    [J]. Flexible Services and Manufacturing Journal, 2013, 25 : 94 - 121
  • [19] An ant-based coordination mechanism for resource-constrained project scheduling with multiple agents and cash flow objectives
    Fink, Andreas
    Homberger, Joerg
    [J]. FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2013, 25 (1-2) : 94 - 121
  • [20] A decision support system for cyclic master surgery scheduling with multiple objectives
    Jeroen Beliën
    Erik Demeulemeester
    Brecht Cardoen
    [J]. Journal of Scheduling, 2009, 12 : 147 - 161