INTEGRATIVE CYCLE SCHEDULING APPROACH FOR A CAPACITATED FLEXIBLE ASSEMBLY SYSTEM

被引:7
|
作者
KIM, D
MABERT, VA
PINTO, PA
机构
[1] INDIANA UNIV,GRAD SCH BUSINESS,DEPT OPERAT MANAGEMENT,BLOOMINGTON,IN 47405
[2] BOWLING GREEN STATE UNIV,COLL BUSINESS ADM,DEPT MANAGEMENT,BOWLING GREEN,OH 43403
关键词
D O I
10.1111/j.1540-5915.1993.tb00466.x
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This study revisits the traditional single stage, multi-item, capacitated lot-sizing problem (CLSP) with a new integrative focus on problem structuring. Unlike past research, we develop integrative cycle scheduling approaches which simultaneously address lot-sizing, capacity, and sequencing issues. Our purposes are to (1) explore the effect of sequencing on inventory levels, (2) examine the problem of infeasibility in the economic lot scheduling problem (ELSP), and (3) provide a simple methodology of generating low-cost cycle schedules in an environment with discrete shipping, dynamic demands, limited capacity, zero setup cost, and sequence-independent setup times. Our procedures are compared to benchmark cycle scheduling approaches in terms of both inventory cost and computation time under different demand scenarios, using the operating data from a flexible assembly system (FAS) at the Ford Motor Company's Sandusky, Ohio plant.
引用
收藏
页码:126 / 147
页数:22
相关论文
共 50 条