A NO-WAIT FLOWSHOP SCHEDULING HEURISTIC TO MINIMIZE MAKESPAN

被引:32
|
作者
RAJENDRAN, C
机构
关键词
FLOWSHOP; HEURISTICS; SCHEDULING;
D O I
10.1057/jors.1994.65
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The scheduling problem in the no-wait or constrained flowshop, with the makespan objective, is considered in this article. A simple heuristic algorithm is proposed on the basis of heuristic preference relations and job insertion. When evaluated over a large number of problems of various sizes, the solutions given by the proposed heuristic are found to be fairly accurate and much superior to those given by the two existing heuristics.
引用
收藏
页码:472 / 478
页数:7
相关论文
共 50 条
  • [41] SOLVABLE CASES OF THE NO-WAIT FLOWSHOP SCHEDULING PROBLEM
    VANDERVEEN, JAA
    VANDAL, R
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1991, 42 (11) : 971 - 980
  • [42] An Iterated Greedy Heuristic for Mixed No-Wait Flowshop Problems
    Wang, Yamin
    Li, Xiaoping
    Ruiz, Ruben
    Sui, Shaochun
    [J]. IEEE TRANSACTIONS ON CYBERNETICS, 2018, 48 (05) : 1553 - 1566
  • [43] A new heuristic for minimal makespan in no-wait hybrid flowshops
    Chang, Junlin
    Ma, Guangfu
    Ma, Xiaoping
    [J]. 2006 CHINESE CONTROL CONFERENCE, VOLS 1-5, 2006, : 395 - +
  • [44] A heuristic for no-wait flow shop scheduling
    Sagar U. Sapkal
    Dipak Laha
    [J]. The International Journal of Advanced Manufacturing Technology, 2013, 68 : 1327 - 1338
  • [45] A heuristic for no-wait flow shop scheduling
    Sapkal, Sagar U.
    Laha, Dipak
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 68 (5-8): : 1327 - 1338
  • [46] Application of ant colony optimization for no-wait flowshop scheduling problem to minimize the total completion time
    Shyu, SJ
    Lin, BMT
    Yin, PY
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2004, 47 (2-3) : 181 - 193
  • [47] A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness
    Prata, Bruno de Athayde
    Nagano, Marcelo Seido
    [J]. ENGINEERING OPTIMIZATION, 2023, 55 (12) : 2070 - 2083
  • [48] No-wait flowshop with separate setup times to minimize maximum lateness
    Ruiz, Ruben
    Allahverdi, Ali
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 35 (5-6): : 551 - 565
  • [49] No-wait flowshop with separate setup times to minimize maximum lateness
    Rubén Ruiz
    Ali Allahverdi
    [J]. The International Journal of Advanced Manufacturing Technology, 2007, 35 : 551 - 565
  • [50] Scheduling the distributed assembly flowshop problem to minimize the makespan
    Ochi, Hanadi
    Driss, Olfa Belkahla
    [J]. CENTERIS2019--INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS/PROJMAN2019--INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT/HCIST2019--INTERNATIONAL CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, 2019, 164 : 471 - 477