Bi-level Programming Model to Solve Facility Configuration and Layout Problems in Railway Stations

被引:0
|
作者
Huang, Junsheng [1 ]
Huang, Huanping [2 ]
Guang, Xiaoping [1 ]
Li, Rong [3 ]
Zhu, Jianshu [4 ]
机构
[1] Lanzhou Jiaotong Univ, Sch Traff & Transportat, 88 Anning West Ave, Lanzhou, Gansu, Peoples R China
[2] Guangxi Univ, Sch Publ Adm, 100 Daxue Rd, Nanning, Peoples R China
[3] Beijing Jiaotong Univ, Sch Traff & Transportat, 3 Shang Yuan Cun Haidian Dist, Beijing, Peoples R China
[4] Univ Tokyo, Inst Ind Sci, Meguro Ku, 4-6-1 KOMABA, Tokyo, Japan
关键词
facility configuration and layout problem; bi-level programming model; genetic simulated annealing algorithm; Lanzhou West Station;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The facility configuration and layout design of hub stations play an essential role in building a practical and cost-efficient hub station system. In general practice, bi-level programming models are implemented based on specific objectives and constraints. In this study, an upper-level model is used to solve the facility configuration problem, which is constructed based on the predetermined facility types to calculate the quantity of each facility by three objectives, including the number of passengers queueing in line, passengers' average waiting time in the queueing system and the cost of facilities. A genetic simulated annealing (GSA) algorithm based on the. -constraints method is presented to optimize the upper-level model. A lower-level model is used to solve the facility layout problem. An optimization solver, named CPLEX, is applied in the lower-level model to calculate the abscissas and ordinates of the facility location after determining the facility configuration in the upper-level model. A case study of the Lanzhou West station in Northern China is demonstrated to verify the efficiency of the optimal solution from the bi-level model by using a commercial pedestrian simulation software, MASSMOTION. This study reveals an innovative method for optimizing station facility configuration and layout by using the heuristic novel algorithm, a discrete event simulation technology and effective utilization of the Building Information Model (BIM) data.
引用
收藏
页码:364 / 371
页数:8
相关论文
共 50 条
  • [41] The appraisal system for parking area and the bi-level programming model
    Shen Qi
    Li Ping
    [J]. 2006 CHINESE CONTROL CONFERENCE, VOLS 1-5, 2006, : 807 - +
  • [42] A bi-level programming model for location of commodity exchange markets
    Li, Ling-ying
    Qiao, Zhong
    [J]. PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON GAME THEORY AND APPLICATIONS, 2007, : 101 - 105
  • [43] Bi-level programming model for optimization design of tidal lane
    Jia, Hong-Fei
    Ding, Xin-Ru
    Yang, Li-Li
    [J]. Jilin Daxue Xuebao (Gongxueban)/Journal of Jilin University (Engineering and Technology Edition), 2020, 50 (02): : 535 - 542
  • [44] Bi-level multi-objective programming model for inter-city railway network scale planning
    Lü, Ming
    Luo, Xia
    Tang, Li
    [J]. Journal of Beijing Institute of Technology (English Edition), 2012, 21 (SUPPL.2): : 189 - 195
  • [45] Railway Alignment Optimization Based on Multiobjective Bi-Level Programming Considering Ecological Impact
    Yang, Dongying
    Yi, Sirong
    He, Qing
    Liu, Dewei
    Wang, Yifeng
    [J]. IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2023, 24 (02) : 1712 - 1726
  • [46] COUPLING SIMULATION WITH HEURISTICLAB TO SOLVE FACILITY LAYOUT PROBLEMS
    Beham, Andreas
    Kofler, Monika
    Wagner, Stefan
    Affenzeller, Michael
    [J]. PROCEEDINGS OF THE 2009 WINTER SIMULATION CONFERENCE (WSC 2009 ), VOL 1-4, 2009, : 2146 - 2158
  • [47] Railway disruption: a bi-level rescheduling algorithm
    Cavone, G.
    Blenkers, L.
    van den Boom, T.
    Dotoli, M.
    Seatzu, C.
    De Schutter, B.
    [J]. 2019 6TH INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT 2019), 2019, : 54 - 59
  • [48] Bi-level programming based layout optimization of water-land intermodal transport hub
    Wu, Zhihua
    [J]. APPLIED SCIENCE, MATERIALS SCIENCE AND INFORMATION TECHNOLOGIES IN INDUSTRY, 2014, 513-517 : 703 - 708
  • [49] Optimal capacity configuration for power to gas facilities in a wind farm: a bi-level programming
    Chen, Zexing
    Zhang, Yongjun
    Su, Jieying
    [J]. 2018 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2018, : 1416 - 1421
  • [50] Connection Facility Layout Model of Subway Stations
    Yao, Liya
    Sun, Lishan
    Wang, Wuhong
    Xia, Xinfeng
    [J]. ADVANCES IN MECHANICAL ENGINEERING, 2015, 7 (01)