Does Supplier Evaluation Impact Process Improvement?

被引:3
|
作者
Prasad, Shiva H. C. [1 ]
Kamath, Giridhar [1 ]
Barkur, Gopalkrishna [1 ]
Nayak, Rakesh [1 ]
机构
[1] Manipal Univ, Manipal Inst Technol, Manipal, Karnataka, India
来源
JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM | 2016年 / 9卷 / 03期
关键词
cost; delivery; partial least square; process improvement; quality; supplier evaluation; supplier relationship management;
D O I
10.3926/jiem.1777
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose: The research explores and examines factors for supplier evaluation and its impact on process improvement particularly aiming on a steel pipe manufacturing firm in Gujarat, India. Design/Methodology/approach: The conceptual research framework was developed and hypotheses were stated considering the analysis of literature and discussions with the managers and engineers of a steel pipe manufacturing company in Gujarat, India. Data was collected using in-depth interview. The questionnaire primarily involves the perception of evaluation of supplier. Factors influencing supplier evaluation and its influence on process improvement is also examined in this study. The model testing and validation was done using partial least square method. Outcomes signified that the factors that influence evaluation of the supplier are quality, cost, delivery and supplier relationship management. Findings and Originality/value: The study depicted that quality and cost factors for supplier evaluation are insignificant. The delivery and supplier relationship management have significant influence on evaluation of the supplier. The research also depicted that supplier evaluation has significant influence on process improvement. Research limitations/implications: The study has been made specifically for ABC steel pipe manufacturing industry in Gujarat, India and may not be appropriate to the other industries or any parts of the world. There is a possibility of response bias as the conclusions of this research was interpreted on survey responses taken from the employees of case study company, so it is suggested that future research can overcome this problem by employing various methodologies in addition to surveys like carrying out focus group and in-depth interviews, brainstorming sessions with the experts etc. Originality/value: Many researchers have considered quality, cost and delivery as the factors for evaluating the suppliers. But for a company it is quintessential to have good relationship with the supplier. Hence, the factor, supplier relationship management is considered for the study. Also, the case study company focused more on quality and cost factors for the supplier evaluation of the firm. However delivery and supplier relationship management are also equally important for a firm in evaluating the supplier.
引用
收藏
页码:708 / 731
页数:24
相关论文
共 50 条
  • [21] Joint optimization of process improvement investments for supplier-buyer cooperative commerce
    Comeaux, EJ
    Sarker, BR
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2005, 56 (11) : 1310 - 1324
  • [22] How Does a Laboratory Measure Process Improvement?
    Zucker, Marcia L.
    LABMEDICINE, 2011, 42 (05): : 314 - 315
  • [23] Tracing impact in a usability improvement process
    Uldall-Espersen, Tobias
    Frokjaer, Erik
    Hornbaek, Kasper
    INTERACTING WITH COMPUTERS, 2008, 20 (01) : 48 - 63
  • [24] The impact of Agile and Lean on process improvement
    Turner, Richard, 1600, U.S. Department of Defense (30):
  • [25] On the business impact of software process improvement
    Kusters, RJ
    Trienekens, JJM
    Hassoldt, W
    26TH ANNUAL INTERNATIONAL COMPUTER SOFTWARE AND APPLICATIONS CONFERENCE, PROCEEDINGS, 2002, : 59 - 64
  • [26] Continuous improvement along the supply chain: The impact of customer-supplier relations
    Kerrin, Máire
    Integrated Manufacturing Systems, 2002, 13 (03): : 141 - 149
  • [27] The supplier evaluation model based on the Analytic Hierarchy Process and Grey Relative Analysis Process
    Zhao, Xiuxu
    Liang, Ting
    2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2008, : 2209 - 2213
  • [28] AN APPROACH TO SUPPLIER QUALITY IMPROVEMENT
    TRENT, JE
    IEEE COMMUNICATIONS MAGAZINE, 1986, 24 (08) : 44 - 47
  • [29] Supplier Competition and Cost Improvement
    Li, Cuihong
    Wan, Zhixi
    MANAGEMENT SCIENCE, 2017, 63 (08) : 2460 - 2477
  • [30] Integration of gas cluster process for copper interconnects reliability improvement and process impact evaluation on BEOL dielectric materials
    Gras, R.
    Gosset, L. G.
    Hopstaken, M.
    Bouyssou, R.
    Chevolleau, T.
    Petitprez, E.
    Girault, V.
    Jullian, S.
    Guillan, J.
    Imbert, G.
    Fossati, D.
    Le Friec, Y.
    Torres, J.
    MICROELECTRONIC ENGINEERING, 2007, 84 (9-10) : 2184 - 2187