共 50 条
- [47] AN ALGORITHM FOR THE N/M PARALLEL C MAX PREEMPTIVE DUE-DATE SCHEDULING PROBLEM [J]. ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1991, 21 (01): : 43 - 49
- [49] Single-machine scheduling and slack due-date assignment with aging effect and deteriorating maintenance [J]. Optimization Letters, 2012, 6 : 1855 - 1873