共 50 条
- [41] Basic Principles for Planning Continuous Hot Wide Strip Mills. [J]. Baender Bleche Rohre, 1982, 23 (10): : 265 - 269
- [42] DETERMINATION OF ROLL GAPS FOR INITIAL SETTING OF WIDE HOT STRIP MILLS [J]. STEEL IN THE USSR, 1977, 7 (10): : 571 - 573
- [43] CAPITAL EXPENDITURES AND OPERATING COSTS OF WIDE HOT-STRIP MILLS [J]. STAHL UND EISEN, 1975, 95 (14): : 633 - 639
- [44] HOT WATER PROCESS-DEVELOPMENT FOR UTAH TAR SANDS [J]. FUEL PROCESSING TECHNOLOGY, 1982, 6 (01) : 27 - 59
- [45] CONCEPTIONS CONCERNING SCALING PROCESS ON HOT STRIP ROLLING MILLS AND OF ITS EFFECT ON PICKLING OF HOT STRIP [J]. ARCHIV FUR DAS EISENHUTTENWESEN, 1971, 42 (04): : 257 - &
- [46] PRINCIPAL PARAMETERS OF SYSTEMS OF INTERSTAND STRIP COOLING ON CONTINUOUS HOT WIDE-STRIP MILLS [J]. STEEL IN THE USSR, 1979, 9 (07): : 351 - 352
- [47] Development of integrated shape control technologies in hot strip mills [J]. Beijing Keji Daxue Xuebao, 2007, 5 (519-522):
- [48] Development and application of the asymmetry work roll for hot strip mills [J]. Beijing Keji Daxue Xuebao, 2008, 7 (805-809):
- [49] DEVELOPMENT OF CROSS PROFILE OF STRIPS ROLLED ON HOT STRIP MILLS [J]. NEUE HUTTE, 1992, 37 (6-7): : 225 - 228
- [50] DEVELOPMENT OF IN-LINE ROLL GRINDING FOR HOT STRIP MILLS [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (05): : S319 - S319