共 50 条
- [41] The Work Day Determination Method of the New "Nuclear Power Plant Construction Budget Quota" Based on the Work Day of "National General Budget Quota" PROCEEDINGS OF THE 20TH PACIFIC BASIN NUCLEAR CONFERENCE, VOL 1, 2017, : 965 - 976
- [42] THE NEW HALF TON PER DAY COPROCESSING PILOT-PLANT AT CANMETS ENERGY RESEARCH LABORATORIES ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 1988, 195 : 5 - FUEL
- [43] MIDLANDS DIECASTING FOUNDRY EXPANDS - 30,000 CASTINGS A DAY FROM BROCKHOUSE SUBSIDIARYS NEW PLANT METALLURGIA, 1966, 73 (438): : 155 - &
- [44] AUSTRIAN PRECAST PLANT WITH NEW FOCAL POINT IN ITS PRODUCTION: PRESTRESSED HOLLOW CORE SLABS UP TO 400 MM DEPTH. Betonwerk und Fertigteil-Technik/Concrete Precasting Plant and Technology, 1987, 53 (04): : 270 - 277
- [45] THE PROCESS-CONTROL SYSTEM AND SPECIAL ELECTRONIC POWER-SYSTEMS FOR A NEW 4000T/DAY CEMENT PLANT ZEMENT-KALK-GIPS, 1985, 38 (03): : 124 - &
- [46] OPERATING EXPERIENCE WITH 2 NEW 4500-T DAY PRODUCTION LINES AT THE EL TABBIN CEMENT PLANT, CAIRO, EGYPT ZEMENT-KALK-GIPS, 1988, 41 (12): : 589 - 594
- [48] Study of Mask and Wafer Co-design That Utilizes a New Extreme SIMD Approach to Computing in Memory Manufacturing-Full-Chip Curvilinear ILT in a Day PHOTOMASK TECHNOLOGY 2019, 2019, 11148
- [49] Day-ahead Optimal Dispatch Method for Flexible DC System with Pumped Storage Hydropower Plant and New Energy Power Generation Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2021, 45 (15): : 36 - 44