THERMIONIC TOPPING OF THE BOILER OF AN 800-MW POWER GENERATING-UNIT

被引:0
|
作者
BEREZINETS, PA
KACHALIN, EA
机构
关键词
D O I
暂无
中图分类号
O414.1 [热力学];
学科分类号
摘要
引用
收藏
页码:636 / 639
页数:4
相关论文
共 50 条
  • [31] CERTAIN FEATURES OF AERODYNAMICS OF THE FURNACE CHAMBER IN THE GAS OIL-FIRED TGMP-204P BOILER OF AN 800 MW GENERATING-UNIT WITH A BOTTOM ARRANGEMENT OF BURNERS
    CHUPROV, VV
    USMAN, YM
    ABRYUTIN, AA
    ANTONOV, AY
    ZHIVAEV, AS
    KOZLOV, VG
    LEVIN, MM
    THERMAL ENGINEERING, 1990, 37 (02) : 66 - 70
  • [32] An analysis of problems arising during operation of the Perm district power plant 800-MW power unit at sliding pressure
    Avrutsky G.D.
    Zakharov A.E.
    Sargsyan V.A.
    Frolov M.S.
    Schwartz A.L.
    Adamov A.S.
    Therm. Eng., 9 (615-620): : 615 - 620
  • [33] HEAT ABSORPTION OF THE HEATING SURFACES OF THE P-57 BOILER IN THE 500 MW PILOT GENERATING-UNIT OPERATING ON EKIBASTUZ COAL
    SHLYGIN, VV
    CHAKRYGIN, VG
    BARANENKO, VD
    IVANOV, AG
    THERMAL ENGINEERING, 1981, 28 (05) : 279 - 281
  • [34] REDUCTION OF BOILER FEED PUMP NOISE IN AN 800 MW COAL-FIRED GENERATING UNIT.
    Thompson, A.R.
    Hoover, R.M.
    1978,
  • [35] WATER-CHEMISTRY CONDITIONS OF THE 1200-MW POWER GENERATING-UNIT AT KOSTROMA CENTRAL POWER-STATION
    RAZUMOVSKAYA, ED
    EZHUNOV, VE
    THERMAL ENGINEERING, 1985, 32 (08) : 459 - 460
  • [36] HEAT ENGINEERING PROBLEMS IN DEVELOPMENT OF BOILER UNITS OF POWER-STATIONS WITH THERMIONIC TOPPING
    BEREZINETS, PA
    SHVARTS, AL
    THERMAL ENGINEERING, 1981, 28 (07) : 388 - 390
  • [37] 800-MW Supercritical Coal-Fired Boilers in Suizhong Power Plant
    By Zou Haifeng
    Electricity, 2005, (02) : 30 - 33
  • [38] Tests of a P-67 boiler for an 800 MW unit
    Vasilyev V.V.
    Borisov V.N.
    Petrov V.N.
    Kardachov A.S.
    Porozov S.V.
    Grebenkov P.Yu.
    Yanov S.R.
    Nazarov M.N.
    Maidanik M.N.
    Power Technology and Engineering, 2010, 44 (4) : 307 - 313
  • [39] GENERATING-UNIT MODELING IN POWER-SYSTEM ADEQUACY ANALYSIS
    BILLINTON, R
    DEBNATH, K
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 1990, 27 (02) : 155 - 165
  • [40] DEVELOPMENT OF MEASURES TO IMPROVE THE RELIABILITY OF THE FLANGED JOINTS OF HIGH-PRESSURE HEATERS OF 800-MW POWER GENERATING-UNITS
    NOSULKO, DR
    BUGASOV, AV
    THERMAL ENGINEERING, 1984, 31 (11) : 635 - 637