共 50 条
- [21] Remediation work underway at Cigar Lake mine NUCLEAR ENGINEERING INTERNATIONAL, 2006, 51 (629): : 3 - 3
- [24] Underground flooding halts Cigar Lake mine development E&MJ-ENGINEERING AND MINING JOURNAL, 2006, 207 (09): : 5 - 5
- [25] Bluestone Lake intake shaft 1999 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 1999, : 753 - 760
- [28] THE CIGAR LAKE URANIUM DEPOSIT - DISCOVERY AND GENERAL-CHARACTERISTICS CIM BULLETIN, 1986, 79 (886): : 70 - 82
- [30] DESIGN OF DRILLING-MINING FOR OPEN SHAFT IN EAST SIDE TO TRPECA MINES - STANTERG 16TH INTERNATIONAL MULTIDISCIPLINARY SCIENTIFIC GEOCONFERENCE, SGEM 2016: SCIENCE AND TECHNOLOGIES IN GEOLOGY, EXPLORATION AND MINING, VOL II, 2016, : 263 - 268