SHAFT DESIGN FOR CIGAR LAKE MINING

被引:0
|
作者
SCOTT, JB
机构
关键词
D O I
暂无
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
引用
收藏
页码:18 / 19
页数:2
相关论文
共 50 条
  • [1] Shaft flooding delays Cigar Lake
    不详
    E&MJ-ENGINEERING AND MINING JOURNAL, 2006, 207 (04): : 6 - 6
  • [2] THE CIGAR LAKE MINING TEST
    MARINO, JM
    SCHMITKE, BW
    CIM BULLETIN, 1992, 85 (960): : 37 - 42
  • [3] The Cigar Lake project - Mining, ore handling and milling
    Edwards, CR
    CIM BULLETIN, 2004, 97 (1078): : 105 - 114
  • [4] DESIGN CONSIDERATION FOR THE CIGAR LAKE MINE DEVELOPMENT
    PEEBLES, GA
    CIM BULLETIN, 1988, 81 (911): : 94 - 94
  • [5] Cigar Lake
    不详
    NUCLEAR PLANT JOURNAL, 2005, 23 (01) : 13 - 13
  • [6] CIGAR LAKE OWNERSHIP
    SLAMA, JP
    CANADIAN MINING JOURNAL, 1987, 108 (01) : 10 - 10
  • [7] Process design for handling, transporting and milling Cigar Lake ore
    Edwards, CR
    Schnell, H
    URANIUM 2000 - PROCESS METALLURGY OF URANIUM, 2000, : 47 - 61
  • [8] Flood delays Cigar Lake
    不详
    NUCLEAR ENGINEERING INTERNATIONAL, 2006, 51 (623): : 6 - 6
  • [9] Processing of Cigar Lake ore in the McClean Lake mill
    Remple, G
    Schnell, H
    URANIUM 2000 - PROCESS METALLURGY OF URANIUM, 2000, : 63 - 75
  • [10] SUDOITE FROM CIGAR LAKE, SASKATCHEWAN
    PERCIVAL, JB
    KODAMA, H
    CANADIAN MINERALOGIST, 1989, 27 : 633 - 641