MEASUREMENT ISSUES IN PERFORMANCE-BASED LOGISTICS

被引:27
|
作者
Doerr, Kenneth [1 ]
Lewis, Ira
Eaton, Donald R.
机构
[1] US Navy, Washington, DC 20350 USA
关键词
D O I
10.1108/JOPP-05-02-2005-B002
中图分类号
C93 [管理学]; D035 [国家行政管理]; D523 [行政管理]; D63 [国家行政管理];
学科分类号
12 ; 1201 ; 1202 ; 120202 ; 1204 ; 120401 ;
摘要
Performance Based Logistics (PBL) is an acquisition reform that is intended to improve weapon systems logistics by reducing cost, improving reliability, and reducing footprint. PBL is an extension of a broad process of rationalizing and, in many cases, outsourcing government services. As with other examples of governmental service outsourcing, measurement issues arise in the gap between governmental objectives and service measurement, and in the contrast between clear profit-centered vendor metrics, and more complex mission-oriented governmental metrics. Beyond this, however, PBL presents new challenges to the relationship between governmental agencies and their service vendors. In many cases, weapons systems logistical support involves levels of operational risk that are more difficult to measure and more difficult to value than other government services. We discuss the implications of operational risk and other measurement issues on PBL implementation.
引用
收藏
页码:164 / 186
页数:23
相关论文
共 50 条
  • [31] Assessing the Performance-based Logistics Service Model for Taiwan's Heavy Vehicle Supply Chains
    Su, Shong-lee Ivan
    Cui, Lianguang
    Hertz, Susanne
    [J]. TRANSPORTATION JOURNAL, 2017, 56 (01) : 77 - 103
  • [32] Construction quality issues in performance-based wind engineering: Effect of missing fasteners
    Van De Lindt, John W.
    Dao, Thang Nguyen
    [J]. Wind and Structures, An International Journal, 2010, 13 (03): : 221 - 234
  • [33] Analysis of performance-based issues in green transportation management systems in smart cities
    Chen, Liang
    Anandhan, Prathik
    Balamurugan, S.
    [J]. ELECTRONIC LIBRARY, 2020, 38 (5-6): : 963 - 977
  • [34] Restructuring state major programs to address performance-based budgeting and issues programming
    Gunderson, K
    Sargent, SA
    Jacob, SG
    Hochmuth, GJ
    Cantliffe, DJ
    [J]. HORTTECHNOLOGY, 2002, 12 (03) : 492 - 495
  • [35] IMPLEMENTING PERFORMANCE-BASED CONTRACTING IN THE JTPA OLDER WORKER PROGRAM - ISSUES AND RECOMMENDATIONS
    LATTING, JK
    JACKSON, RH
    [J]. EVALUATION AND PROGRAM PLANNING, 1990, 13 (02) : 133 - 143
  • [36] Research on optimization of multi-objective maintenance decision under performance-based logistics strategy
    Zhu, Xi
    Hu, Qiwei
    Bai, Yongsheng
    Wen, Liang
    Li, Juan
    [J]. Yi Qi Yi Biao Xue Bao/Chinese Journal of Scientific Instrument, 2021, 42 (05): : 184 - 191
  • [37] PERFORMANCE-BASED CODES
    WATTS, JM
    [J]. FIRE TECHNOLOGY, 1994, 30 (04) : 385 - 386
  • [38] Research on Relationship of Network Embeddedness and Logistics Enterprises Service Innovation Performance-Based on the Dynamic Capability
    Tian, Xue
    Zheng, Caiyun
    Li, Xiaoyi
    Liu, Yingying
    Si, Weipeng
    Yang, Jianglong
    [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON SOCIAL SCIENCE, EDUCATION MANAGEMENT AND SPORTS EDUCATION, 2015, 39 : 1378 - 1384
  • [39] Sources of measurement error in an ECG examination: Implications for performance-based assessments
    Solomon, DJ
    Ferenchick, G
    [J]. ADVANCES IN HEALTH SCIENCES EDUCATION, 2004, 9 (04) : 283 - 290
  • [40] Performance-based measurement of aggression in a computer game-embedded simulation
    Aidman, EV
    [J]. AUSTRALIAN JOURNAL OF PSYCHOLOGY, 2004, 56 : 154 - 154