共 50 条
- [31] SIMULTANEOUS OPTIMIZATION OF THE REHEAT PRESSURE AND PREHEATING LINE FOR SINGLE-REHEAT SUPERCRITICAL STEAM POWER PLANTS REVUE ROUMAINE DES SCIENCES TECHNIQUES-SERIE ELECTROTECHNIQUE ET ENERGETIQUE, 2020, 65 (3-4): : 277 - 280
- [32] Determination of the optimum power rating of a back-pressure steam turbine in a co-generation system of waste-steam utilization OCOS 2000: FROM THERMO-ECONOMICS TO SUSTAINABILITY, PTS 1-4, 2000, : 533 - 543
- [35] Optimum heating of thick-walled pressure components assuming a quasi-steady state of temperature distribution Journal of Thermal Science, 2016, 25 : 380 - 388
- [37] Initial operating experience with the steam turbines of the new Gera North Heating Power Plants VGB-Kraftwerkstechnik, 1998, 78 (05): : 85 - 89
- [40] An analysis of the parameters of stable-pressure steam purging for a 600 MW supercritical boiler at Zhenjiang power plant 2005, Harbin Research Institute, Harbin, China (20):