25 MW(E) GEESTHACHT (KSH) NUCLEAR POWER PLANT

被引:0
|
作者
BOHM, E
机构
来源
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
引用
收藏
页码:19 / &
相关论文
共 50 条
  • [21] CONSTRUCTION AND OPERATING EXPERIENCE WITH THE 300-MW THTR NUCLEAR-POWER-PLANT
    BAUMER, R
    KALINOWSKI, I
    ROHLER, E
    SCHONING, J
    WACHHOLZ, W
    [J]. NUCLEAR ENGINEERING AND DESIGN, 1990, 121 (02) : 155 - 166
  • [22] Following calculations for core operation of Qinshan 300MW nuclear power plant
    Research Inst of Nuclear Power, Operation, Wuhan, China
    [J]. Hedongli Gongcheng, 3 (205-210, 225):
  • [23] THTR, 300-MW PROTOTYPE NUCLEAR POWER PLANT WITH HIGH TEMPERATURE REACTOR
    SCHWEIGE.F
    [J]. BRENNSTOFF-WARME-KRAFT, 1969, 21 (11): : 583 - &
  • [24] 1160 MW turbine for '%'Donald C.Cook'%' nuclear power plant of AEP
    HOSSLI W
    [J]. 1600, (59):
  • [25] Design process for an advanced reactor coolant pump for a 1400 MW nuclear power plant
    Knierim, Claus
    Baumgarten, Sven
    Fritz, Jochen
    [J]. Proceedings of the ASME Fluids Engineering Division Summer Conference - 2005, Vol 1, Pts A and B, 2005, : 1363 - 1369
  • [26] 25 years after the accident at the Chernobyl nuclear power plant: Radioecological lessons
    Alexakhin, R. M.
    Geras'kin, S. A.
    [J]. RADIOPROTECTION, 2011, 46 (06) : S595 - S600
  • [27] In commemoration of the 25th anniversary of the accident at the Chernobyl Nuclear Power Plant
    Burlakova E.B.
    Naidich V.I.
    [J]. Biophysics, 2011, 56 (5) : 941 - 949
  • [28] A detailed nuclear power plant model for power system analysis based on PSS/E
    Gao, Huimin
    Wang, Chao
    Pan, Wulue
    [J]. 2006 IEEE/PES POWER SYSTEMS CONFERENCE AND EXPOSITION. VOLS 1-5, 2006, : 1582 - +
  • [29] The 30 MW pilot power plant
    [J]. Chen, F. (falin@iam.ntu.edu.tw), 1600, Springer Verlag, Tiergartenstrasse 17, Heidelberg, D-69121, Germany (15):
  • [30] NUCLEAR-POWER AT 25
    RALOFF, J
    [J]. SCIENCE NEWS, 1983, 123 (01) : 12 - 13