FUELING OF D2O REACTORS .2.

被引:0
|
作者
DUSCH, F [1 ]
MOLDASCHL, H [1 ]
机构
[1] KRAFTWERK UNION AG,ERLANGEN,FED REP GER
来源
ATOMKERNENERGIE | 1977年 / 29卷 / 04期
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The transition of fresh natural uranium cores to burnup equilibrium is demonstrated in the case of fueling for the nuclear power plant Atucha (Argentina). The loading operations were determined by use of the heterogeneous 3-D code TRISIC. A stationary burnup distribution was already obtained after approx. 420fpd. During the last 18 months (April 1975-September 1976) the availability factor was 94%, the capacity factor of 92% was only a little below this value. The number of defective fuel pins which occurred up to the present is low, having a failure rate below 0. 05%.
引用
收藏
页码:259 / 260
页数:2
相关论文
共 50 条