RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH TIME-RESOURCE TRADEOFFS - THE NON-PREEMPTIVE CASE

被引:279
|
作者
TALBOT, FB
机构
关键词
D O I
10.1287/mnsc.28.10.1197
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:1197 / 1210
页数:14
相关论文
共 50 条
  • [1] Resource-constrained project scheduling with renewable and non-renewable resources and time-resource tradeoffs
    Nudtasomboon, N
    Randhawa, SU
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 32 (01) : 227 - 242
  • [2] A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
    Van Peteghem, Vincent
    Vanhoucke, Mario
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 201 (02) : 409 - 418
  • [3] Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting
    Cheng, Junzilan
    Fowler, John
    Kempf, Karl
    Mason, Scott
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2015, 53 : 275 - 287
  • [4] A note on "a genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem"
    Han, Yi
    Cai, Jianhu
    Kaku, Ikou
    Lin, Huazhen
    Ye, Xuhong
    Guo, Haidong
    [J]. NUMBERS, INTELLIGENCE, MANUFACTURING TECHNOLOGY AND MACHINERY AUTOMATION, 2012, 127 : 527 - +
  • [5] The preemptive stochastic resource-constrained project scheduling problem
    Creemers, Stefan
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 277 (01) : 238 - 247
  • [6] Offline Equivalence: A Non-Preemptive Scheduling Technique for Resource-Constrained Embedded Real-Time Systems
    Nasri, Mitra
    Brandenburg, Bjorn B.
    [J]. PROCEEDINGS OF THE 23RD IEEE REAL-TIME AND EMBEDDED TECHNOLOGY AND APPLICATIONS SYMPOSIUM (RTAS 2017), 2017, : 75 - 86
  • [7] Hybrid particle swarm optimization for preemptive resource-constrained project scheduling
    Shou, Yongyi
    Li, Ying
    Lai, Changtao
    [J]. NEUROCOMPUTING, 2015, 148 : 122 - 128
  • [8] Resource-constrained project scheduling with flexible resource profiles in continuous time
    Naber, Anulark
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2017, 84 : 33 - 45
  • [9] Resource-constrained project scheduling and timetabling
    Brucker, P
    Knust, S
    [J]. PRACTICE AND THEORY OF AUTOMATED TIMETABLING III, 2001, 2079 : 277 - 293
  • [10] A Multi-Agent Optimization Method for Preemptive Resource-Constrained Project Scheduling
    Shou, Yongyi
    Hu, Wenjin
    Lai, Changtao
    Ying, Ying
    [J]. INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2019, 10 (01) : 21 - 33