Concession period of public private partnership projects: industry-academia gap analysis

被引:17
|
作者
Ullah, Fahim [1 ]
Thaheem, Muhammad Jamaluddin [1 ]
机构
[1] NUST, NIT SCEE, Dept Construct Engn & Management CE&M, Islamabad, Pakistan
关键词
Public-private partnership; concession period; critical success factors; knowledge gap; industry-academia linkages;
D O I
10.1080/15623599.2017.1333400
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
With increasing global adoption, various critical aspects of public-private partnership (PPP) concessions are highlighted. One such aspect is the way academia and industry perceive and weigh different critical success factors (CSFs) of PPP concession. Due to difference of perception, considerable temporal as well as opinion gap exists between the two knowledge streams, leading to improper resource allocation and inadequate decision-making. This study identifies CSFs and quantifies the gap between the two streams using a detailed methodology of identifying CSFs from extensive literature review published during period 2005-2015, and ranking those CSFs separately through questionnaire surveys from 60 industrial and 56 academic experts having thorough experience of various types of PPP. Based upon responses, 8-9 years' gap between both streams is found. For 18% CSFs, opinion difference is greater than 50% pointing to a weaker collaboration. Decision-makers can understand the gap between both streams and develop policy framework for their collaboration. Better resource management can be ensured leading to improved chances of project success. Academia can expand upon the identified CSFs and explore their interactions on individual and cumulative levels. This will bridge gap and induce the ever desired mutualism between the two streams.
引用
收藏
页码:418 / 429
页数:12
相关论文
共 50 条
  • [41] The execution of public-private partnership projects in the UAE
    Dulaimi, Mohammed Fadhil
    Alhashemi, Mohamed
    Ling, Florence Yean Yng
    Kumaraswamy, Mohan
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2010, 28 (04) : 393 - 402
  • [42] A NEW CHALLENGE FOR THE MANAGEMENT OF PUBLIC PRIVATE PARTNERSHIP PROJECTS
    Mandruleanu, Anca
    Coretchi, Doru
    [J]. PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON BUSINESS EXCELLENCE, VOL 1, 2011, : 290 - 292
  • [43] Liability of Foreignness in Public-Private Partnership Projects
    Kong, Zijiong
    Ma, Hanyang
    Lv, Kangjuan
    Shi, Jonathan J. J.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (09)
  • [44] Discounting for public-private partnership projects in China
    Luo, Lanlan
    Zou, Ziran
    Chen, Shou
    [J]. ECONOMIC MODELLING, 2021, 98 : 218 - 226
  • [45] Risk Allocation in Public-Private Partnership Projects
    Jin Xiaohua
    [J]. PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2009, : 326 - 330
  • [46] Uncertainty Analysis of Value for Money Assessment for Public-Private Partnership Projects
    梁晴雪
    胡昊
    [J]. Journal of Shanghai Jiaotong University(Science), 2017, 22 (06) : 672 - 681
  • [47] Uncertainty analysis of value for money assessment for public-private partnership projects
    Liang Q.
    Hu H.
    [J]. Journal of Shanghai Jiaotong University (Science), 2017, 22 (6) : 672 - 681
  • [48] A critical analysis of public private partnership model in energy from waste projects
    Tahir, Junaid
    Atkinson, Mark
    Tian, Zhigang
    Kassem, Mohamad
    Ahmad, Rafiq
    Martinez, Pablo
    [J]. SUSTAINABLE FUTURES, 2024, 8
  • [49] Cost and Schedule Performance Analysis of Transportation Public-Private Partnership Projects
    Ramsey, David
    El Asmar, Mounir
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2020, 12 (01)
  • [50] Competencies and urban Public Private Partnership projects in India: A case study analysis
    Devkar, Ganesh A.
    Mahalingam, Ashwin
    Kalidindi, Satyanarayana N.
    [J]. POLICY AND SOCIETY, 2013, 32 (02) : 125 - 142