共 50 条
- [41] SLIME-CEMENT FILL AS A STOPE SUPPORT FOR GOLD-MINES [J]. JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1978, 78 (11): : 290 - 295
- [42] THE FURRY CATERPILLAR - A NEW TECHNIQUE IN THE MANAGERIAL CONTROL OF GOLD-MINES [J]. JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1984, 84 (02): : 45 - 49
- [43] NEW DEVELOPMENTS IN BOREHOLE VALUATIONS FOR NEW GOLD-MINES AND UNDEVELOPED SECTIONS OF EXISTING MINES [J]. JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1992, 92 (03): : 71 - 77
- [44] Development-sampling and ore-valuation of gold-mines [J]. TRANSACTIONS OF THE AMERICAN INSTITUTE OF MINING AND METALLURGICAL ENGINEERS, 1908, 39 : 685 - 694
- [45] AN AID FOR GOLD-MINES OR THE SILENT PHANTOM OF BRETTON-WOODS [J]. CANADIAN PUBLIC POLICY-ANALYSE DE POLITIQUES, 1983, 9 (04): : 446 - 457
- [46] TRIALS ON BLINDHOLE BORING IN SOUTH-AFRICAN GOLD-MINES [J]. JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1978, 78 (07): : 175 - 187
- [47] FILL SUPPORT SYSTEMS FOR DEEP-LEVEL GOLD-MINES [J]. JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1977, 78 (02): : 34 - 46
- [48] OPTIMIZATION OF SAMPLE SPACING IN SOUTH-AFRICAN GOLD-MINES [J]. JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1976, 76 (09): : 392 - 399