AUTOMATIC START-UP AND OPERATION OF POWER GENERATING PLANTS WITH A COMBINED GAS-STEAM CYCLES

被引:0
|
作者
AEBERLI, WA
DARIMONT, AH
机构
关键词
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
引用
收藏
页码:51 / &
相关论文
共 50 条
  • [1] Research on Static Start-up Control Technology for Gas-Steam Combined Cycle Unit
    Wang, Deshun
    Sang, Bingyu
    Yang, Bo
    Li, Guanjun
    Tao, Yibin
    Yu, Bin
    [J]. POWER AND ENERGY ENGINEERING CONFERENCE 2010, 2010, : 167 - 171
  • [2] COMBINED GAS-STEAM POWER-PLANTS
    GERGELY, B
    [J]. ENERGIA ES ATOMTECHNIKA, 1977, 30 (09): : 417 - 425
  • [3] COMBINED GAS-STEAM CYCLE POWER-PLANTS
    BUCHET, E
    [J]. REVUE GENERALE DE THERMIQUE, 1981, 20 (233): : 391 - 404
  • [4] Coordinated Control of Gas and Steam Turbines for Efficient Fast Start-Up of Combined Cycle Power Plants
    Yoshida, Yasuhiro
    Yamanaka, Kazunori
    Yamashita, Atsushi
    Iyanaga, Norihiro
    Yoshida, Takuya
    [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2017, 139 (02):
  • [5] PARAMETRIC ANALYSIS OF COMBINED GAS-STEAM CYCLES
    CERRI, G
    [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 1987, 109 (01): : 46 - 54
  • [6] CHARACTERISTICS OF MODERN COMBINED GAS-STEAM TURBINE POWER-PLANTS
    STANISA, B
    [J]. STROJARSTVO, 1994, 36 (3-4): : 169 - 182
  • [7] CALCULATION FOR PART-LOAD OPERATION OF COMBINED GAS-STEAM TURBINE PLANTS
    KEHLHOFER, R
    [J]. BROWN BOVERI REVIEW, 1978, 65 (10): : 672 - 679
  • [8] ENERGY AND COST EFFECTIVENESS ANALYSIS OF STEAM AND GAS-STEAM COMBINED HEAT AND POWER PLANTS
    Zaporowski, Boleslaw
    [J]. RYNEK ENERGII, 2008, (05): : 41 - 44
  • [9] STEAM-TURBINES AT START-UP OPERATION
    HOHN, A
    [J]. BRENNSTOFF-WARME-KRAFT, 1974, 26 (08): : 344 - 351
  • [10] COMBINED GAS-STEAM TURBINE POWER-PLANTS FOR THE COGENERATION OF HEAT AND ELECTRICITY
    KEHLHOFER, R
    [J]. BROWN BOVERI REVIEW, 1978, 65 (10): : 680 - 686