FAST-TRACK PRODUCTION PROJECT CUTS INSTALLATION TIME IN HALF

被引:0
|
作者
VARGAS, KJ
机构
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
引用
收藏
页码:58 / 62
页数:5
相关论文
共 50 条
  • [1] Fast-track production project cuts installation time in half
    Vargas, K.J.
    Oil and Gas Journal, 1991, 89 (06): : 58 - 62
  • [2] Fast-track hysterectomy: a pilot project
    Ulrich, D.
    Tamussino, K.
    Fruhmann, A.
    Mueller, G.
    Amon, B.
    Schoenett, B.
    Bjelic-Radisic, V
    Bader, A.
    Winter, R.
    GEBURTSHILFE UND FRAUENHEILKUNDE, 2009, 69 (05) : 478 - 478
  • [3] Fast-track your pilot plant project
    Martin, P
    Dietrich, MJ
    CHEMICAL ENGINEERING PROGRESS, 2005, 101 (01) : 26 - 31
  • [4] Fast-track project management in the biopharmaceutical industry
    Djurslev, Finn
    Proceedings of 20th IPMA World Congress on Project Management, Vols 1 and 2, 2006, : 51 - 53
  • [5] Mediation - A Fast-track Solution to fast-track Problems
    Clifford, W.D.
    2001, Construction Specifications Institute Inc. (54):
  • [6] THE FAST-TRACK
    KAPLAN, JA
    JOURNAL OF CARDIOTHORACIC AND VASCULAR ANESTHESIA, 1995, 9 (05) : 1 - 1
  • [7] FAST-TRACK
    MCMILLION, R
    ABA JOURNAL, 1993, 79 : 97 - 97
  • [8] Vacuum column revamp - a fast-track turnkey project
    Hood, AR
    Stander, A
    Lilburne, G
    Soydaner, S
    HYDROCARBON PROCESSING, 1999, 78 (11): : 63 - +
  • [9] FAST-TRACK PROJECT SCHEDULE SPEEDS CORRECTIONAL FACILITIES
    SMITH, WD
    MCCARTHY, J
    AMERICAN CITY & COUNTY, 1984, 99 (03) : 56 - &
  • [10] Design challenges for wax in a fast-track deepwater project
    Alwazzan, Amir
    Utgard, Mark
    Barros, Dalmo
    JPT, Journal of Petroleum Technology, 2009, 61 (06): : 45 - 47