Pile-raft interaction by using modified Geddes model and variable rigidity design method for balance settlement
被引:0
|
作者:
Jin Yong-tao
论文数: 0引用数: 0
h-index: 0
机构:
Nanjing Nanda Geotech Engn Co Ltd, Nanjing 210024, Jiangsu, Peoples R ChinaNanjing Nanda Geotech Engn Co Ltd, Nanjing 210024, Jiangsu, Peoples R China
Jin Yong-tao
[1
]
Yang Hua
论文数: 0引用数: 0
h-index: 0
机构:
Zhejiang Acad Bldg Res & Design Co Ltd, Hangzhou 310012, Zhejiang, Peoples R ChinaNanjing Nanda Geotech Engn Co Ltd, Nanjing 210024, Jiangsu, Peoples R China
Yang Hua
[2
]
Li Feng-li
论文数: 0引用数: 0
h-index: 0
机构:
Nanjing Nanda Geotech Engn Co Ltd, Nanjing 210024, Jiangsu, Peoples R ChinaNanjing Nanda Geotech Engn Co Ltd, Nanjing 210024, Jiangsu, Peoples R China
Li Feng-li
[1
]
机构:
[1] Nanjing Nanda Geotech Engn Co Ltd, Nanjing 210024, Jiangsu, Peoples R China
[2] Zhejiang Acad Bldg Res & Design Co Ltd, Hangzhou 310012, Zhejiang, Peoples R China
Although the interaction among piles should be calculated by Geddes's stress method, which can not consider the raft rigidity, it can't be applied to pile-raft interaction. Geddes's stress method is modified and the modified calculation models is verified in practice. The balance settlement method based on variable rigidity which can reduce differential settlement and hypo-stress is introduced through adjusting the array of pile group.
引用
收藏
页码:3875 / 3879
页数:5
相关论文
共 14 条
[11]
Poulos HG., 1980, PILE FDN ANAL DESIGN
[12]
Wang H., 2007, CHINESE J ROCK MECH, V26, P3223
[13]
[杨敏 Yang Min], 2005, [土木工程学报, China Civil Engineering Journal], V38, P103