共 50 条
- [32] DATA SHEET FOR THE CONTROL ENGINEERING IN NUCLEAR-POWER STATIONS .17. NUCLEAR-POWER STATION GUNDREMMINGEN BRENNSTOFF-WARME-KRAFT, 1994, 46 (09): : 407 - 414
- [33] DATA SHEET NO-16 FOR THE CONTROL ENGINEERING IN NUCLEAR-POWER STATIONS (NUCLEAR-POWER STATION GRAFENRHEINFELD (KKG) .2. BRENNSTOFF-WARME-KRAFT, 1988, 40 (10): : 388 - 394
- [34] SUPPLY OF THE BALANCE OF PRIMARY PLANT FOR KO-RI NUCLEAR-POWER STATION UNIT-1 NUCLEAR ENERGY-JOURNAL OF THE BRITISH NUCLEAR ENERGY SOCIETY, 1980, 19 (05): : 361 - 368
- [36] DATA SHEET IN NUCLEAR-POWER STATIONS, NO 20 COMMUNAL NUCLEAR-POWER STATION NECKAR UNIT-II (KONVOI-NUCLEAR POWER-STATION GKN II) BRENNSTOFF-WARME-KRAFT, 1993, 45 (09): : 395 - 404
- [37] DEVELOPING NEUTRON-FLUX CONTROL ALGORITHMS FOR THE REACTOR IN THE 2ND UNIT AT THE BELOYARSK NUCLEAR-POWER STATION SOVIET ATOMIC ENERGY, 1986, 60 (05): : 359 - 363
- [38] SUDDEN PRESSURE TUBE FAILURE IN PICKERING NUCLEAR GENERATING-STATION UNIT-2 NUCLEAR SAFETY, 1985, 26 (03): : 349 - 358
- [39] BROKDORF NUCLEAR-POWER STATION - CONSTRUCTION SCHEDULING AND DEADLINE CONTROL ATOMWIRTSCHAFT-ATOMTECHNIK, 1986, 31 (8-9): : 428 - 430
- [40] UPDATING THE CONTROL AND INSTRUMENTATION SYSTEMS ON AN OPERATIONAL NUCLEAR-POWER STATION JOURNAL OF THE INSTITUTION OF ELECTRONIC AND RADIO ENGINEERS, 1987, 57 (04): : 156 - 160