共 50 条
- [1] CONSTRUCTION OF UNIT-2 OF THE PHILIPPSBURG NUCLEAR-POWER STATION ATOMWIRTSCHAFT-ATOMTECHNIK, 1985, 30 (02): : 70 - 79
- [3] SEP OPERATING HISTORY OF THE DRESDEN NUCLEAR-POWER STATION UNIT-2 TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1983, 44 : 388 - 389
- [4] NATURAL DRAFT WET COOLING-TOWER OF THE NUCLEAR-POWER-STATION-PHILIPPSBURG (UNIT-2) BRENNSTOFF-WARME-KRAFT, 1984, 36 (7-8): : 313 - 313
- [6] TESTING OF COMPUTER CONTROL OF REACTOR POWER-SYSTEM AT GENTILLY NUCLEAR-POWER STATION JOURNAL OF THE BRITISH NUCLEAR ENERGY SOCIETY, 1973, 12 (01): : 85 - 94
- [7] TESTING OF NUCLEAR STATION PHENIX - CONTROL-SYSTEM TRIALS BULLETIN D INFORMATIONS SCIENTIFIQUES ET TECHNIQUES DU COMMISSARIAT A L ENERGIE ATOMIQUE, 1975, (199): : 81 - 86
- [8] Evaluation of Acceptance Tests on the 1300 MW Unit at Philippsburg Nuclear Power Station (KKP 2). VGB-Kraftwerkstechnik, 1987, 67 (02): : 103 - 109
- [9] THE BUILDING OF A NUCLEAR-POWER KNOWLEDGE-BASED CONTROL-SYSTEM PROCEEDINGS OF THE 1989 AMERICAN CONTROL CONFERENCE, VOLS 1-3, 1989, : 2230 - 2232
- [10] EXPERIENCE OF ADVANCED MONITORING AND CONTROL-SYSTEM FOR NUCLEAR-POWER STATIONS TOSHIBA REVIEW, 1986, (157): : 8 - 11