OPTIMIZING THE YIELD FROM EXISTING HYDROELECTRIC GENERATING FACILITIES

被引:0
|
作者
PFAFFLIN, GE
机构
关键词
D O I
暂无
中图分类号
TB3 [工程材料学]; TS [轻工业、手工业、生活服务业];
学科分类号
0805 ; 080502 ; 0822 ;
摘要
引用
收藏
页码:51 / 58
页数:8
相关论文
共 50 条
  • [21] Evaluation of gaseous emission from energy generating facilities
    Gierzatowicz, R
    THERMAL SOLID WASTE UTILISATION IN REGULAR INDUSTRIAL FACILITIES, 2000, 58 : 121 - 131
  • [22] Optimizing compliance cost for coal-fired electric generating facilities in a multipollutant control environment
    Staudt, JE
    PROCEEDINGS OF 2004 ASME POWER, 2004, : 205 - 214
  • [23] TRENDS IN HYDROELECTRIC GENERATING EQUIPMENT TECHNOLOGY.
    Yoshizawa, Takanori
    Hitachi Review, 1979, 28 (04): : 167 - 170
  • [24] Innovations at hydroelectric plant pumped storage facilities
    Heninger, L.
    Spitzer, F.
    Elektrotechnik und Informationstechnik, 2009, 126 (12):
  • [25] Lignous pressure lines for hydroelectric facilities.
    不详
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1920, 64 : 814 - 814
  • [26] Condition information processing of hydroelectric generating set
    Chen, QJ
    Li, YP
    INTERNATIONAL CONFERENCE ON SENSORS AND CONTROL TECHNIQUES (ICSC 2000), 2000, 4077 : 334 - 337
  • [27] EVALUATION OF PADDLE WHEELS IN GENERATING HYDROELECTRIC POWER
    Liu, Yucheng
    Peymani, Yoosef
    INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION - 2012, VOL 6, PTS A AND B, 2013, : 675 - 684
  • [28] OPTIMIZING ELECTRIC-POWER FROM A SMALL-SCALE HYDROELECTRIC PLANT
    LEVY, D
    JOURNAL OF THE INSTITUTE OF ENERGY, 1990, 63 (456): : 109 - 118
  • [29] Energy modelling of existing facilities
    Nisbet, N.
    Cartwright, J.
    Aizlewood, M.
    EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION, 2016, : 331 - 337
  • [30] OPTIMIZING YIELD FROM RIMMING STEEL INGOTS
    ZAYAKIN, BI
    BIGEEV, AM
    RABINOVI.EI
    STAL IN ENGLISH-USSR, 1967, (11): : 922 - &