INCORPORATING PREFERENCE INFORMATION INTO MULTIOBJECTIVE SCHEDULING

被引:10
|
作者
DANIELS, RL
机构
[1] Fuqua School of Business, Duke University, Durham
关键词
SCHEDULING; MULTIPLE CRITERIA;
D O I
10.1016/0377-2217(94)90372-7
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Multi-criteria scheduling problems have typically been formulated with an objective of identifying the entire set of schedules efficient with respect to the performance measures of interest. This paper focuses on multi-objective scheduling situations where information concerning the relative importance of the criteria is available through interaction with a given decision maker. In addition to providing a means for directly determining the most-preferred schedule for that individual, this preference information can also be exploited to enhance the computational efficiency of the solution process. To demonstrate the latter advantage, three forms of managerial interaction are considered, consistent with situations where (i) no preference information is available, (ii) preferences are completely represented by an additive objective function, and (iii) no explicit objective is given, but a decision maker can precisely provide local trade-off (marginal rates of substitution) information. A general tree-based solution framework is proposed for the three cases, with dominance results and bounds obtained from the available preference information used to simplify the search for the most-preferred schedule. The computational performance of the solution approaches is then experimentally compared to determine the efficiencies that result from the incorporation of preference information.
引用
收藏
页码:272 / 286
页数:15
相关论文
共 50 条
  • [21] Incorporating preference information in a range directional composite indicator: The case of Portuguese public hospitals *
    Pereira, Miguel Alves
    Camanho, Ana Santos
    Figueira, Jose Rui
    Marques, Rui Cunha
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 294 (02) : 633 - 650
  • [22] Utopian preference mapping and the utopian preference method for group multiobjective optimization
    HU Yuda
    2. Department of Mathematics
    3. Department of Mathematics
    [J]. Progress in Natural Science:Materials International, 2003, (08) : 15 - 19
  • [23] Utopian preference mapping and the utopian preference method for group multiobjective optimization
    Hu, YD
    Hong, ZJ
    Zhou, XW
    [J]. PROGRESS IN NATURAL SCIENCE, 2003, 13 (08) : 573 - 577
  • [24] Multiobjective scheduling for semiconductor manufacturing plants
    Senties, O. Baez
    Azzaro-Pantel, C.
    Pibouleau, L.
    Domenech, S.
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2010, 34 (04) : 555 - 566
  • [25] Heuristic for a new multiobjective scheduling problem
    Anne Setämaa-Kärkkäinen
    Kaisa Miettinen
    Jarkko Vuori
    [J]. Optimization Letters, 2007, 1 : 213 - 225
  • [26] Heuristic for a new multiobjective scheduling problem
    Setamaa-Karkkainen, Anne
    Miettinen, Kaisa
    Vuori, Jarkko
    [J]. OPTIMIZATION LETTERS, 2007, 1 (03) : 213 - 225
  • [27] Multiobjective Airline Scheduling: An Integrated Approach
    Chen, Chiu-Hung
    Liu, Tung-Kuan
    Chou, Jyh-Horng
    Wang, Chuen-Ching
    [J]. 2012 PROCEEDINGS OF SICE ANNUAL CONFERENCE (SICE), 2012, : 1266 - 1270
  • [28] Multiobjective scheduling of a reentrant hybrid flowshop
    Dugardin, Frederic
    Amodeo, Lionel
    Yalaoui, Farouk
    [J]. CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 193 - 198
  • [29] Fuzzy preference relations and multiobjective decision making
    Ekel, P
    Martins, C
    Campos, C
    Neto, FS
    Palhares, R
    [J]. Soft Computing as Transdisciplinary Science and Technology, 2005, : 83 - 92
  • [30] MULTIOBJECTIVE SCHEDULING PLANS FOR SECURITY GUARDS
    SINUANYSTERN, Z
    TEOMI, Y
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1986, 37 (01) : 67 - 77