共 50 条
- [41] IMPROVEMENT OF OPERATIONAL PLANNING OF BASIC OXYGEN CONVERTER PLANT-OPERATION STEEL IN THE USSR, 1980, 10 (02): : 109 - 110
- [42] RESULTS OF NUCLEAR-POWER PLANT-OPERATION IN THE EEC IN 1982 ATOMWIRTSCHAFT-ATOMTECHNIK, 1983, 28 (12): : 649 - 653
- [43] ADVANCED CONTROL-SYSTEM SIMPLIFIES PRETREATMENT PLANT-OPERATION WATER-ENGINEERING & MANAGEMENT, 1987, 134 (06): : 36 - 38
- [44] PROHIBITION OF PLANT-OPERATION DUE TO LACK OF ENVIRONMENTAL RELIABILITY OF THE OWNER STAUB REINHALTUNG DER LUFT, 1986, 46 (01): : 36 - 37
- [45] RESULTS OF NUCLEAR-POWER PLANT-OPERATION IN THE EEC IN 1981 ATOMWIRTSCHAFT-ATOMTECHNIK, 1982, 27 (12): : 649 - 654
- [46] RESULTS 1980 OF NUCLEAR-POWER PLANT-OPERATION IN THE EEC ATOMWIRTSCHAFT-ATOMTECHNIK, 1981, 26 (12): : 671 - 676
- [48] OPTIMIZATION OF GAS-ADSORPTION DRYING PLANT-OPERATION CONDITIONS KHIMICHESKAYA PROMYSHLENNOST, 1984, (02): : 113 - 115
- [50] RESULTS OF NUCLEAR-POWER PLANT-OPERATION IN THE EEC IN 1983 ATOMWIRTSCHAFT-ATOMTECHNIK, 1984, 29 (12): : 657 - 661