AGE COMPOSITION OF EQUIPMENT AND RECOVERY OF ITS COST

被引:0
|
作者
LUTAI, NV
机构
来源
RUSSIAN ENGINEERING JOURNAL-USSR | 1968年 / 48卷 / 03期
关键词
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:89 / &
相关论文
共 50 条
  • [1] COST ESCALATION - ITS IMPACT ON PURCHASED EQUIPMENT
    BONANO, DR
    CHEMICAL ENGINEERING, 1975, 82 (14) : 81 - 83
  • [2] Accounting of safety of equipment during evaluating its cost
    Trejer, V.V.
    Rozanov, O.V.
    Gazovaya Promyshlennost, 2004, (02): : 13 - 16
  • [3] HODGKINS-DISEASE - RECOVERY AND ITS COST
    JACQUILLAT, C
    AUCLERC, G
    AUCLERC, MF
    WEIL, M
    REVUE DU PRATICIEN, 1984, 34 (21): : 1075 - 1080
  • [4] FURNACE TOP EQUALIZING GAS RECOVERY EQUIPMENT AND ITS OPERATION
    YANO, T
    SAITO, S
    SHUTO, M
    KATO, G
    BABA, M
    TRANSACTIONS OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1983, 23 (12) : B396 - B396
  • [5] A technique used for estimating the processing cost of IT equipment received by an asset recovery center
    Grenchus, EJ
    Keene, RA
    2003 IEEE INTERNATIONAL SYMPOSIUM ON ELECTRONICS & THE ENVIRONMENT, CONFERENCE RECORD, 2003, : 205 - 208
  • [6] Geostress measurement using rheological stress recovery method and its equipment
    Zhang Fang
    Liu Quan-sheng
    Zhang Cheng-yuan
    Jiang Jing-dong
    ROCK AND SOIL MECHANICS, 2014, 35 (05) : 1506 - 1513
  • [7] Geostress measurement using rheological stress recovery method and its equipment
    Zhang, F. (zf_19870411@163.com), 1600, Academia Sinica (35):
  • [8] Transmission pricing considering cost composition and its allocation
    Hunan University, Changsha 410082, China
    Dianli Zidonghua Shebei Electr. Power Autom. Equip., 2007, 3 (53-56):
  • [9] Discussion on Construction Project Cost Composition and Its Management
    Xiao, Yang
    2013 3RD INTERNATIONAL CONFERENCE ON EDUCATION AND EDUCATION MANAGEMENT (EEM 2013), 2013, 27 : 390 - 393
  • [10] COST OF EQUIPMENT REPAIRS
    OSLER, GE
    BECKER, H
    SOUTH AFRICAN MEDICAL JOURNAL, 1984, 66 (17): : 632 - 632