INCREASING CENTRAL POWER IN EBR-II

被引:0
|
作者
MILLER, LB [1 ]
JARKA, RE [1 ]
GILLETTE, JL [1 ]
KIRN, FS [1 ]
机构
[1] ARGONNE NATL LAB, 9700 S CASS AVE, ARGONNE, IL 60439 USA
来源
关键词
D O I
暂无
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
引用
下载
收藏
页码:180 / 181
页数:2
相关论文
共 50 条
  • [21] ENVIRONMENTAL INSTRUMENTED SUBASSEMBLY FOR EBR-II
    GILLETTE, JL
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1973, 17 (NOV): : 180 - 180
  • [22] INSTRUMENTED SUBASSEMBLY SYSTEM IN EBR-II
    SMAARDYK, A
    DIVONA, CJ
    HUTTER, E
    NUCLEAR TECHNOLOGY, 1971, 10 (02) : 139 - &
  • [23] DEMONSTRATION OF EBR-II POWER MANEUVERS WITHOUT CONTROL ROD MOVEMENT
    CHANG, LK
    MOHR, D
    PLANCHON, HP
    FELDMAN, EE
    MESSICK, NC
    NUCLEAR ENGINEERING AND DESIGN, 1989, 113 (01) : 141 - 148
  • [24] SODIUM SAMPLING AND ANALYSIS AT EBR-II
    OLSON, WH
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1971, 14 (02): : 618 - &
  • [25] BURNUP AND FLUENCE HISTORY OF EBR-II
    WALKER, P
    MENEGHETTI, D
    SULLIVAN, JE
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1972, 15 (02): : 986 - +
  • [26] ANALYSIS OF EBR-II DOSIMETRY MEASUREMENTS
    SEHGAL, BR
    KIRN, FS
    REMPERT, RH
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1972, 15 (02): : 985 - +
  • [27] TRITIUM IN EBR-II REACTOR COMPLEX
    EBERSOLE, ER
    VROMAN, WR
    KRSUL, JR
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1971, 14 (01): : 321 - &
  • [28] CALCULATED POWER DISTRIBUTION IN EBR-II CONTROL ROD BELOW CORE
    FRANKLIN, FC
    MENEGHETTI, D
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1981, 38 (JUN): : 671 - 672
  • [29] STRUCTURAL-ANALYSES OF EBR-II PRIMARY SYSTEM PIPING FOR EBR-II SRM OPERATING-CONDITIONS
    CHANG, LK
    WU, TS
    FELDMAN, EE
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1977, 27 (NOV): : 740 - 741
  • [30] ANALYSIS OF REACTION-RATE MEASUREMENTS IN EBR-II AT FULL POWER
    SEHGAL, BR
    REMPERT, RH
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1973, 17 (NOV): : 530 - 531