共 50 条
- [24] BEHAVIOR OF A 2-DISSIMILAR UNIT IMPERFECT STANDBY SYSTEM WITH CONNECTED SWITCHING AND PRIORITY REPAIR ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND MECHANIK, 1979, 59 (07): : 323 - 326
- [25] REPAIR LIMIT SUSPENSION POLICIES FOR A 2-UNIT STANDBY REDUNDANT SYSTEM WITH 2 PHASE REPAIRS MICROELECTRONICS AND RELIABILITY, 1977, 16 (01): : 41 - 45
- [26] 2 UNIT STANDBY REDUNDANT SYSTEM WITH IMPERFECT SWITCHOVER MICROELECTRONICS AND RELIABILITY, 1978, 17 (06): : 585 - 586
- [27] PROFIT OPTIMIZATION IN A 2-UNIT MAINTAINED STANDBY REDUNDANT SYSTEM ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND MECHANIK, 1980, 60 (12): : 725 - 732
- [28] BEHAVIOR OF STEADY-STATE PROFIT IN A 2-UNIT COLD STANDBY REDUNDANT SYSTEM ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND MECHANIK, 1977, 57 (02): : 124 - 127
- [29] OPTIMUM PREVENTIVE MAINTENANCE POLICY FOR 2-UNIT PRIORITY STANDBY REDUNDANT SYSTEM WITH MINIMAL REPAIR MICROELECTRONICS AND RELIABILITY, 1978, 18 (06): : 535 - 538
- [30] NOTE ON REPAIR LIMIT SUSPENSION POLICIES FOR A 2-UNIT STANDBY REDUNDANT SYSTEM WITH 2 PHASE REPAIRS MICROELECTRONICS AND RELIABILITY, 1978, 17 (06): : 591 - 592