UPGRADING HYDROELECTRIC GENERATING FACILITIES

被引:0
|
作者
COULSON, DM
VILLALON, M
机构
关键词
D O I
暂无
中图分类号
TB3 [工程材料学]; TS [轻工业、手工业、生活服务业];
学科分类号
0805 ; 080502 ; 0822 ;
摘要
引用
收藏
页码:78 / 81
页数:4
相关论文
共 50 条
  • [1] OPTIMIZING THE YIELD FROM EXISTING HYDROELECTRIC GENERATING FACILITIES
    PFAFFLIN, GE
    PULP & PAPER-CANADA, 1987, 88 (11) : 51 - 58
  • [2] Upgrading Hydroelectric Power Investment Policy
    I. I. Fain
    Hydrotechnical Construction, 2000, 34 (8-9) : 403 - 408
  • [3] UPGRADING - NEW LIFE FOR HYDROELECTRIC SYSTEMS
    RITTENHOUSE, RC
    POWER ENGINEERING, 1986, 90 (03) : 18 - 24
  • [4] UPGRADING: NEW LIFE FOR HYDROELECTRIC SYSTEMS.
    Rittenhouse, R.C.
    Power Engineering (Barrington, Illinois), 1986, 90 (03): : 18 - 24
  • [5] Mini-hydroelectric facilities in Portugal
    Correia, CAC
    da Silva, CMS
    Carvalho, JAB
    UPEC 2004: 39th International Universitities Power Engineering Conference, Vols 1-3, Conference Proceedings, 2005, : 618 - 622
  • [6] Desanding facilities for hydroelectric power stations
    Buchi, J
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1927, 71 : 1224 - 1226
  • [7] THE PRESENZANO HYDROELECTRIC GENERATING AND PUMPING STATION
    不详
    ELETTROTECNICA, 1989, 76 (01): : 79 - 82
  • [8] Efficiency Curves for Hydroelectric Generating Units
    Hidalgo, Ieda G.
    Fontane, Darrell G.
    Lopes, Joao E. G.
    Andrade, Jose G. P.
    de Angelis, Andre F.
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2014, 140 (01) : 86 - 91
  • [9] DISCHARGE ALLOCATION FOR HYDROELECTRIC GENERATING STATIONS
    KLEIN, EM
    SIM, SH
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 73 (01) : 132 - 138
  • [10] Biorefineries: For biomass upgrading facilities
    Demirbas A.
    Green Energy and Technology, 2010, 26 : iii - iv