DISCHARGE ALLOCATION FOR HYDROELECTRIC GENERATING STATIONS

被引:3
|
作者
KLEIN, EM [1 ]
SIM, SH [1 ]
机构
[1] ONTARIO HYDRO,DIV RES,800 KIPLING AVE,TORONTO M8Z 5S4,ONTARIO,CANADA
关键词
SEPARABLE PROGRAMMING; LINEAR PROGRAMMING; HEURISTIC ALGORITHM; HYDROELECTRIC GENERATING STATION;
D O I
10.1016/0377-2217(94)90151-1
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper is concerned with the allocation of discharge among generating units of a hydro-electric generating station so as to maximize power output within operating constraints. A hybrid separable programming-heuristic algorithm has been developed for solving the discharge allocation problem where the generating units may not be identical. The algorithm was tested and found to increase the power output of a hydro-electric generating station. For the discharge allocation problem with identical generating units, a simple heuristic approach is proposed. The above results extend the earlier work of Bernholtz.
引用
收藏
页码:132 / 138
页数:7
相关论文
共 50 条
  • [1] STATION SERVICE SYSTEMS FOR LARGE HYDROELECTRIC GENERATING STATIONS
    TAWTEL, V
    STUART, RH
    [J]. IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1968, PA87 (02): : 579 - &
  • [2] Model for Electricity Price in Hydroelectric Generating Stations under Deregulation
    Reji, P.
    Ashok, S.
    Moideenkutty, K. M.
    [J]. INTERNATIONAL ENERGY JOURNAL, 2008, 9 (01): : 65 - 72
  • [3] Reliability analysis in support of risk assessment for hydroelectric generating stations
    Vo, TV
    Blackburn, TR
    Casazza, LO
    Heasler, PG
    Mara, NL
    Phan, HK
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1997, 123 (03): : 179 - 188
  • [4] A logistic regression model for estimating turbine mortality at hydroelectric generating stations
    Gibson, AJF
    Myers, RA
    [J]. TRANSACTIONS OF THE AMERICAN FISHERIES SOCIETY, 2002, 131 (04) : 623 - 633
  • [5] DESIGN OF HYDROELECTRIC STATIONS
    PALO, GP
    MARKS, CR
    [J]. TRANSACTIONS OF THE AMERICAN SOCIETY OF CIVIL ENGINEERS, 1946, 111 : 1175 - 1189
  • [6] VIBRATION MONITORING APPROACH IN INTEGRATED SYSTEM OF HYDROELECTRIC GENERATING SETS FOR SMART POWER STATIONS
    Wu, Yuechao
    Li, Zhaohui
    Li, Bailin
    Chu, Fanwu
    Cui, Xiaolong
    [J]. INTERNATIONAL JOURNAL OF POWER AND ENERGY SYSTEMS, 2016, 36 (04): : 147 - 155
  • [7] Optimizing the use of water resources at hydroelectric stations: A case study of Akosombo Generating Statioan, Ghana
    Hlordjie, IJ
    [J]. Proceedings of the World Engineers' Convention 2004, Vol F-B, Power and Energy, 2004, : 602 - 608
  • [8] Technological equipment of hydroelectric stations
    A. D. Stotskii
    B. N. Yurkevich
    [J]. Hydrotechnical Construction, 1997, 31 (8): : 489 - 492
  • [9] SURVEILLANCE OF HYDROELECTRIC STATIONS SYSTEM
    ARRIGONI, A
    BIANCO, D
    TOSI, R
    [J]. ELETTROTECNICA, 1974, 61 (07): : 649 - 650
  • [10] Power production of hydroelectric stations calculated for providing fuel to power systems with a large share of hydroelectric stations
    A. Sh. Reznikovskii
    M. I. Rubinshtein
    [J]. Hydrotechnical Construction, 1997, 31 (3): : 156 - 163