共 50 条
- [41] NEW GRAVITY-PRESSURE UNIT CUTS SLUDGE DEWATERING COSTS. Civil Engineering (New York), 1976, 46 (01): : 69 - 73
- [43] SLUDGE DEWATERING AND DISPOSAL PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS, 1968, 41 (NOV): : 623 - &
- [48] CORRECT APPROACH CUTS ROAD CORE DRILLING COSTS BY 50 PERCENT INDUSTRIAL DIAMOND REVIEW, 1974, 34 (MAY): : 172 - 173
- [50] Testing protocol and breakeven cost analysis of mud dewatering for closed-loop drilling system JOURNAL OF CANADIAN PETROLEUM TECHNOLOGY, 1997, 36 (03): : 51 - 62