PERCEPTIONS RESULTING FROM NEW REQUIREMENTS FOR CONTROL ROOM PERSONNEL

被引:0
|
作者
MALLAY, JF [1 ]
LEVERENZ, F [1 ]
机构
[1] NUCL SAFETY ANAL CTR, PALO ALTO, CA 94303 USA
来源
关键词
D O I
暂无
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
引用
收藏
页码:239 / 239
页数:1
相关论文
共 50 条
  • [31] NEW CONTROL ROOM FOR HYDRO BOARD
    ROBERTSON, T
    ELECTRICAL REVIEW, 1970, 187 (23): : 797 - +
  • [32] Examining student perceptions of school climate, school personnel, and school discipline: Evidence from New York City
    Welsh, Richard O.
    Rodriguez, Luis A.
    Joseph, Blaise
    JOURNAL OF SCHOOL PSYCHOLOGY, 2024, 107
  • [33] TECHNOLOGICAL ADVANCEMENTS RESULTING FROM XB-70 PERFORMANCE REQUIREMENTS
    ROGERSON, DB
    SAE TRANSACTIONS, 1966, 74 : 155 - &
  • [35] Experimental determination of air inleakage to pressurized main control room caused by personnel entering
    Chang, Le
    Zhang, Xu
    Cai, Yingying
    BUILDING AND ENVIRONMENT, 2016, 99 : 142 - 148
  • [36] New Requirements Elicited from Accidents of Train Control System Simulated by Modelica
    Zhong, Wen
    Wang, Yan
    Chen, Xiaohong
    REQUIREMENTS ENGINEERING FOR INTERNET OF THINGS, 2018, 809 : 189 - 204
  • [37] ALCOHOL AND INJURIES RESULTING FROM VIOLENCE - A REVIEW OF EMERGENCY ROOM STUDIES
    CHERPITEL, CJ
    ADDICTION, 1994, 89 (02) : 157 - 165
  • [38] Concepts and requirements for an advanced clinic-wide Operating Room Control Center
    Maktabi, Marianne
    Rockstroh, Max
    Neumann, Juliane
    Neumuth, Thomas
    BIOMEDICAL ENGINEERING-BIOMEDIZINISCHE TECHNIK, 2014, 59 : S1237 - +
  • [39] Implications of New Stringent Requirements for Contamination Control
    Anderson, John R.
    Ferraro, Ned
    Soares, Carlos
    SYSTEMS CONTAMINATION: PREDICTION, CONTROL, AND PERFORMANCE 2018, 2018, 10748
  • [40] CONTROL OF NOISE RESULTING FROM THE TRANSFER OF PLATES
    KAWAKAMI, K
    TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 : 1111 - 1111