A New Multi-objective Model for Multi-mode Project Planning with Risk

被引:7
|
作者
Mollaei, H. R. [1 ]
Tavakkoli-Moghaddam, R. [2 ]
Toloie-Eshlaghy, A. [1 ]
机构
[1] Islamic Azad Univ, Sci & Res Branch, Dept Ind Management, Tehran, Iran
[2] Univ Tehran, Sch Ind Engn, Coll Engn, Tehran, Iran
来源
INTERNATIONAL JOURNAL OF ENGINEERING | 2018年 / 31卷 / 05期
关键词
Project Scheduling; Risk based Project Planning; Discrete Time-Cost-Quality-risk Trade-off; Evolutionary Algorithm;
D O I
10.5829/ije.2018.31.05b.12
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The aim of this problem is to choose a set of project activities for crashing in such a way that the expected project time, cost and risk are minimized and the expected quality is maximized. In this problem, each project activity can be performed with a specific executive mode. Each executive mode is characterized with four measures, namely the expected time, cost, quality and risk. In this paper, linear relationships between time and cost, and between time and quality are omitted and the problem of the expected time-cost-quality trade-off is considered in a probabilistic and discrete state (DTCQRTP). Then, to make the problem more real, the combination of four measures are considered as uncertain for each executive mode. It means that the time, cost, quality or risk (or all of them) of each activity in each executive mode is considered as the expected numbers (probabilistic means). After modeling four-objective problems, a test problem with nine activities is presented and solved by the non-dominated sorting genetic algorithm (NSGA-II). In order to improve the results and speed of the proposed algorithm in accessing Pareto solutions, a new hybrid algorithm, called MEM-NSGA, is presented that gives better solutions than the original NSGA-II at the same conditions.
引用
收藏
页码:770 / 779
页数:10
相关论文
共 50 条
  • [21] A multi-objective agile project planning model and a comparative meta-heuristic approach
    Ozcelikkan, Nilay
    Tuzkaya, Gulfem
    Alabas-Uslu, Cigdem
    Sennaroglu, Bahar
    INFORMATION AND SOFTWARE TECHNOLOGY, 2022, 151
  • [22] Collective Multi-Objective Planning
    Mouaddib, Abdel-Illah
    DIS 2006: IEEE WORKSHOP ON DISTRIBUTED INTELLIGENT SYSTEMS: COLLECTIVE INTELLIGENCE AND ITS APPLICATIONS, PROCEEDINGS, 2006, : 43 - 48
  • [23] Multi-objective Transmission Planning
    Xu, Zhao
    Dong, Zhao Yang
    Wong, Kit Po
    Fan, Zhun
    2009 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), VOLS 1-7, 2009, : 2082 - +
  • [24] Formulation and Solution Approach for Uncertain Multi-Objective Material Requirement Planning Problem with Multi-Mode Demand, Overtime Production, and Outsourcing Possibilities
    Niroomand, Sadegh
    Pamucar, Dragan
    Mahmoodirad, Ali
    JOURNAL OF SYSTEMS SCIENCE AND SYSTEMS ENGINEERING, 2025, 34 (01) : 1 - 28
  • [25] A new multi-objective algorithm for a project selection problem
    Ghorbani, S.
    Rabbani, M.
    ADVANCES IN ENGINEERING SOFTWARE, 2009, 40 (01) : 9 - 14
  • [26] Multi-objective Model to Address Planning in a RTS Game
    de Oliveira, Caio Freitas
    Gouvea Goldbarg, Elizabeth Ferreira
    Goldbarg, Marco Cesar
    2016 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2016, : 754 - 761
  • [27] Study on Multi-objective Greenness Planning Model for Liners
    Qi Jun
    Wang Lizheng
    Su Shaojuan
    ADVANCES IN TRANSPORTATION, PTS 1 AND 2, 2014, 505-506 : 666 - +
  • [28] Multi-objective model for regional wastewater systems planning
    Zeferino, Joao A.
    Antunes, Antonio P.
    Cunha, Maria C.
    CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS, 2010, 27 (02) : 95 - 106
  • [29] A multi-objective model for publicly funded festival planning
    Alcada-Almeida, L.
    Sousa, N.
    Coutinho-Rodrigues, J.
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2024,
  • [30] A Multi-objective Model for Transmission Planning Under Uncertainties
    Zhang, Chunyu
    Wang, Qi
    Ding, Yi
    Ostergaard, Jacob
    2014 IEEE ELECTRICAL POWER AND ENERGY CONFERENCE (EPEC), 2014, : 42 - 47