共 50 条
- [23] Development of Watch Schedule Using Rules Approach [J]. INFORMATION SYSTEMS DEVELOPMENT: ASIAN EXPERIENCES, 2011, : 511 - 522
- [24] An Approach to Schedule Production using the Reservation Tables [J]. PROGRESS IN SYSTEMS ENGINEERING, 2015, 366 : 615 - 620
- [25] Developing a draft schedule using templates and rules [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (05): : 391 - 398
- [26] Resource allocation in IT projects: using schedule optimization [J]. IJISPM-INTERNATIONAL JOURNAL OF INFORMATION SYSTEMS AND PROJECT MANAGEMENT, 2014, 2 (03): : 47 - 59
- [27] Using icons to convey medication schedule information [J]. APPLIED ERGONOMICS, 1996, 27 (04) : 267 - 275
- [28] An Approach to Schedule Production Using the Reservation Tables [J]. Adv. Intell. Sys. Comput., (615-620):
- [30] Overall Schedule OPTIMIZATION USING GENETIC ALGORITHMS [J]. PROCEEDINGS OF THE CANADIAN SOCIETY OF CIVIL ENGINEERING ANNUAL CONFERENCE 2022, VOL 4, CSCE 2022, 2024, 367 : 449 - 461