共 50 条
- [41] A BOTTLENECK DETECTION AND DYNAMIC DISPATCHING STRATEGY FOR SEMICONDUCTOR WAFER FABRICATION FACILITIES [J]. PROCEEDINGS OF THE 2009 WINTER SIMULATION CONFERENCE (WSC 2009 ), VOL 1-4, 2009, : 1613 - 1623
- [43] A New Release Control Policy (WRELM) For Semiconductor Wafer Fabrication Facilities [J]. 2014 IEEE 11TH INTERNATIONAL CONFERENCE ON NETWORKING, SENSING AND CONTROL (ICNSC), 2014, : 64 - 68
- [46] Agent-Based Shop Floor Scheduling [J]. INDUSTRIAL APPLICATIONS OF HOLONIC AND MULTI-AGENT SYSTEMS, 2017, 10444 : 24 - 36
- [47] Agent-based scheduling in production systems [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (15) : 3669 - 3679
- [48] Agent-based collaborative scheduling system [J]. 3RD INT CONF ON CYBERNETICS AND INFORMATION TECHNOLOGIES, SYSTEMS, AND APPLICAT/4TH INT CONF ON COMPUTING, COMMUNICATIONS AND CONTROL TECHNOLOGIES, VOL 1, 2006, : 147 - 152
- [49] Agent-based grid scheduling with Calana [J]. PARALLEL PROCESSING AND APPLIED MATHEMATICS, 2006, 3911 : 741 - 750
- [50] Agent-based Hospital Scheduling System [J]. 2019 21ST INTERNATIONAL SYMPOSIUM ON SYMBOLIC AND NUMERIC ALGORITHMS FOR SCIENTIFIC COMPUTING (SYNASC 2019), 2020, : 337 - 338