共 50 条
- [22] Kriging-based heuristic optimization of a continuous concrete box-girder pedestrian bridge [J]. LIFE-CYCLE ANALYSIS AND ASSESSMENT IN CIVIL ENGINEERING: TOWARDS AN INTEGRATED VISION, 2019, : 2753 - 2759
- [25] Cause analysis for shear crack and deflection of long span concrete box-girder bridge [J]. Tongji Daxue Xuebao/Journal of Tongji University, 2009, 37 (01): : 1 - 5
- [27] Field test on temperature field and thermal stress for prestressed concrete box-girder bridge [J]. Frontiers of Architecture and Civil Engineering in China, 2009, 3 (2): : 158 - 164
- [28] Dynamic finite element model updating of prestressed concrete continuous box-girder bridge [J]. Earthquake Engineering and Engineering Vibration, 2009, 8 : 399 - 407
- [29] Structural Assessment of an Existing Concrete Box-Girder Bridge, According to the German and the Dutch Standards [J]. HIGH TECH CONCRETE: WHERE TECHNOLOGY AND ENGINEERING MEET, 2018, : 1804 - 1812
- [30] Optimization on Closure Scheme of Multi-Span Prestressed Concrete Box-Girder Bridge [J]. ADVANCES IN STRUCTURES, PTS 1-5, 2011, 163-167 : 2369 - 2375