共 50 条
- [31] Computer simulation optimizes RIM part design and cuts development costs [J]. Modern Plastics, 1994, 71 (07): : 65 - 67
- [33] ESTIMATE SEWER OVERFLOW FACILITY COSTS [J]. WATER & WASTES ENGINEERING, 1978, 15 (09): : 56 - &
- [37] MANAGED QUALITY CUTS COSTS [J]. AIRCRAFT ENGINEERING AND AEROSPACE TECHNOLOGY, 1994, 66 (06): : 20 - 21
- [40] Slimhole sidetrack cuts costs [J]. JPT, Journal of Petroleum Technology, 1999, 51 (02): : 73 - 74