共 50 条
- [31] INTEGRATION OF BACKFITS INTO PLANT-OPERATIONS - THE CONTROLLED WORK PACKAGE APPROACH [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1984, 46 : 13 - 14
- [32] OPTIMIZATION OF BLAST-FURNACE PLANT AND BASIC OXYGEN FURNACE PLANT-OPERATIONS [J]. 72ND STEELMAKING CONFERENCE PROCEEDINGS, 1989, 72 : 281 - 289
- [33] INPO PROGRAMS FOR IMPROVEMENT OF NUCLEAR-POWER PLANT-OPERATIONS [J]. GOOD PERFORMANCE IN NUCLEAR PROJECTS, 1989, : 398 - 404
- [34] REFINERY PETROCHEMICAL PLANT-OPERATIONS IMPROVEMENT AND DEBOTTLENECK ON IBM-PC [J]. ADVANCES IN INSTRUMENTATION AND CONTROL, VOL 44, PT 1-4, 1989, 44 : 661 - 668
- [35] OPTIMIZING PLANT-OPERATIONS MANAGEMENT - DEVELOPMENTS IN THE FIELD OF PROBABILISTIC SAFETY ANALYSES [J]. ATOMWIRTSCHAFT-ATOMTECHNIK, 1989, 34 (02): : 91 - 92
- [36] PLANT-OPERATIONS ORGANIZATION IN EAST EUROPEAN NUCLEAR-POWER-PLANTS [J]. ATOMWIRTSCHAFT-ATOMTECHNIK, 1993, 38 (02): : 130 - 133
- [38] INDUSTRIAL COMMUNICATION-SYSTEM FOR MODERN PLANT-OPERATIONS AND SUPERVISORY CONTROL [J]. CONTROL AND INSTRUMENTATION, 1983, 15 (02): : 23 - 23
- [40] COMPUTER-GRAPHICS HIERARCHY FOR WASTE-WATER PLANT-OPERATIONS [J]. WATER-ENGINEERING & MANAGEMENT, 1994, 141 (06): : 26 - &