共 50 条
- [41] Lowering SCADA development and implementation costs using PtP concept [J]. 2009 XXII INTERNATIONAL SYMPOSIUM ON INFORMATION, COMMUNICATION AND AUTOMATION TECHNOLOGIES, 2009, : 106 - +
- [42] AN ANALYSIS OF GREEN BUILDING COSTS USING A MINIMUM COST CONCEPT [J]. JOURNAL OF GREEN BUILDING, 2019, 14 (01): : 53 - 77
- [43] Practical Implications of the Weak Signals Concept for Control System of Production Projects Execution [J]. INNOVATION MANAGEMENT AND EDUCATION EXCELLENCE VISION 2020: FROM REGIONAL DEVELOPMENT SUSTAINABILITY TO GLOBAL ECONOMIC GROWTH, VOLS I - VI, 2016, : 1166 - 1178
- [49] Raising Coverage and Capacity using Fixed Relays in a Realistic Scenario [J]. 2008 EUROPEAN WIRELESS CONFERENCE, 2008, : 422 - +
- [50] SOLUTION FOR TRANSPORT AND PRODUCTION PROBLEM OF BUSINESS ENTERPRISE WITH MULTIPLE PLANTS IN CONSIDERATION OF FIXED COSTS [J]. REVUE FRANCAISE D AUTOMATIQUE INFORMATIQUE RECHERCHE OPERATIONNELLE, 1975, 9 (NV3): : 41 - 55