A 100% Renewable Electricity Scenario for the Java']Java-Bali Grid

被引:6
|
作者
Guenther, Matthias [1 ]
Ganal, Irina [2 ]
Bofinger, Stefan [2 ]
机构
[1] Swiss German Univ, Tangerang, Indonesia
[2] Fraunhofer IWES Kassel, Kassel, Germany
关键词
energy modeling; energy resources; storage; long-term storage; time series analysis;
D O I
10.14710/ijred.7.1.13-22
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Currently, many countries try to satisfy their energy needs with an increasing usage of renewable resources. The general motivations, with varying weighting in the different countries, are ecological reasons, concerns about energy security, and economical considerations. A question that is for now rather theoretical, although interesting for opening a long-term perspective, is how an energy supply from exclusively renewable energy resources could look like. This question has to be answered individually for any specific energy supply system. The present paper has the objective to present and evaluate a scenario for an electricity supply only from renewable energy resources for the Java-Bali grid. After designing a load time series for the year 2050 for the Java-Bali grid, a scenario is developed how to cover the load with electricity from renewable energy resources alone. Assumptions about the usable energy sources are made as well as assumptions about the available power plant capacity or energy potential. A specific challenge is the fact that solar energy must be the main source in such a renewable-energy based system, which comes with the need for a large storage capacity to match the power supply at any time with the load. Several possibilities are presented how to bring down the storage capacity: the increment of the installed PV capacity, the usage of bioenergy for seasonal balancing, and the complementation of the proposed short-term storage with an additional long-term storage. The study shows some of the specific challenges that a gradual transformation of the current electricity supply system on Java and Bali into a renewable-energy-based one would face and gives some hints about how to cope with these challenges. Scenarios like the one designed in this study are an important tool for decision-makers who face the task to scrutinize the consequences of choosing between different development paths.
引用
收藏
页码:13 / 22
页数:10
相关论文
共 50 条
  • [21] Monitoring of Frequency Response in Java']Java-Bali System during Loss of Generation Event
    Aji, Hariadi
    Purwanto, Adi
    Pramono, Eko Yudo
    [J]. 2018 INTERNATIONAL CONFERENCE ON SMART GREEN TECHNOLOGY IN ELECTRICAL AND INFORMATION SYSTEMS (ICSGTEIS): SMART GREEN TECHNOLOGY FOR SUSTAINABLE LIVING, 2018, : 24 - 28
  • [22] Designing Sustainable Domestic Electricity Supply from Renewable Energy Mixes: Application to Java']Java and Bali, Indonesia
    Diyono, Diyono
    Cappon, Hans
    Kujawa-Roeleveld, Katarzyna
    Keesman, Karel J.
    [J]. ENERGIES, 2023, 16 (22)
  • [23] CONTINUATION OF CONTRACEPTION ON JAVA']JAVA-BALI - PRELIMINARY-RESULTS FROM THE QUARTERLY ACCEPTOR SURVEY
    TEACHMAN, JD
    SUYONO, H
    PARSONS, JS
    ROHADI
    [J]. STUDIES IN FAMILY PLANNING, 1980, 11 (04) : 134 - 144
  • [24] STRUCTURAL CONTROL ON INDONESIAN VOLCANISM (SUMATRA, JAVA']JAVA-BALI) - APPLICATION AND CRITICISM OF THE NAKAMURA METHOD
    BAHAR, I
    GIROD, M
    [J]. BULLETIN DE LA SOCIETE GEOLOGIQUE DE FRANCE, 1983, 25 (04): : 609 - 614
  • [25] Comparison of Loss Allocation Methods in a Regulated System (A case Study at Java']Java-Bali 500KV Grid System in Indonesia)
    Ansyari, F.
    Oezveren, C. S.
    King, D.
    [J]. 2008 PROCEEDINGS OF THE 43RD INTERNATIONAL UNIVERSITIES POWER ENGINEERING CONFERENCE, VOLS 1-3, 2008, : 509 - 513
  • [26] Effect of indirect lightning strike to 66kV transmission line in Java']Java-Bali system
    Kusuma, Aristo Adi
    Pramana, Putu Agus Aditya
    Harsono, Brian Bramantyo S. D. A.
    Munir, Buyung Sofiarto
    [J]. 3RD ANNUAL APPLIED SCIENCE AND ENGINEERING CONFERENCE (AASEC 2018), 2018, 197
  • [27] Java']Java, Bali
    不详
    [J]. CONNAISSANCE DES ARTS, 1998, (547): : 23 - 23
  • [28] Imaging of upper crustal structure beneath East Java']Java-Bali, Indonesia with ambient noise tomography
    Martha, Agustya Adi
    Cummins, Phil
    Saygin, Erdinc
    Widiyantoro, Sri
    Masturyono
    [J]. GEOSCIENCE LETTERS, 2017, 4
  • [29] Inventory Management Method to Determined Spare Transformer Optimization Java']Java-Bali 500/150 kV Transformer
    Marbun, Musa Partahi
    Sinisuka, Ngapuli Irmea
    Hariyanto, Nanang
    [J]. TENCON 2015 - 2015 IEEE REGION 10 CONFERENCE, 2015,
  • [30] Schedulling Economical Thermal Power Plant 500 KV Java']Java-Bali System Using Lagrange Multiplier
    Sartika, N.
    Abdullah, A. G.
    Hakim, D. L.
    [J]. 1ST ANNUAL APPLIED SCIENCE AND ENGINEERING CONFERENCE (AASEC), IN CONJUCTION WITH THE INTERNATIONAL CONFERENCE ON SPORT SCIENCE, HEALTH, AND PHYSICAL EDUCATION (ICSSHPE), 2017, 180