FACTORS CONTRIBUTING TO NON-ADOPTION OF VALUE ENGINEERING METHODOLOGY FOR BUILDING SERVICES

被引:0
|
作者
Ganiyu, Amuda-Yusuf [1 ]
Taibat, Adebiyi R. [2 ]
Damola, Oyewumi [3 ]
机构
[1] Univ Teknol Malaysia, Fac Built Environm, Skudai 81310, Johor, Malaysia
[2] Univ Ilorin, Fac Environm Sci, Ilorin, Nigeria
[3] Yusab Cost Consultants, 5A, Biodun Adebiyi Close, Ilorin, kwara State, Nigeria
来源
JURNAL TEKNOLOGI | 2015年 / 77卷 / 14期
关键词
Building services; practitioners; value engineering;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The procurement of building services (BS) constitutes a great challenge in the construction industries of both developed and developing countries. Adoption of value engineering (VE) methodology could aid BS components selection at design and installations stages. However, the methodology is not appropriately used by the project team during design and installation of BS. Leading to overdesign, poor quality specification, lack of team work and unreliable budget estimate. The main objective of this paper is to determine the factors preventing the adoption of VE in the procurement of BS projects. A questionnaire was design to collect information on 18 generic factors contributing to non- adoption of VE. The questionnaire was administered to randomly selected practitioners in clients', contracting and consulting types of organisations in Malaysia. The result shows that lack of understanding of VE by clients organisations, lack of request for the services, and inadequate time to conduct the study are the most important factors deterring adoption of VE for building services. The factors analysis of result for the 18 variables produced a four (4) factors result as: Non- involvement of stakeholders; education and traditional practice; resistance to change, and lack of experience about VE. It is essentially important for industry clients to understand the importance of adopting VE so as to ensure that time required for the study are pre- planned and budgeted for at project inception
引用
收藏
页码:15 / 22
页数:8
相关论文
共 27 条
  • [21] Factors Associated with Parental Non-Adoption of Infant Male Circumcision for HIV Prevention in Sub-Saharan Africa: A Systematic Review and Thematic Synthesis
    Webster Mavhu
    Zivai Mupambireyi
    Graham Hart
    Frances M. Cowan
    AIDS and Behavior, 2014, 18 : 1776 - 1784
  • [22] Factors Associated with Parental Non-Adoption of Infant Male Circumcision for HIV Prevention in Sub-Saharan Africa: A Systematic Review and Thematic Synthesis
    Mavhu, Webster
    Mupambireyi, Zivai
    Hart, Graham
    Cowan, Frances M.
    AIDS AND BEHAVIOR, 2014, 18 (09) : 1776 - 1784
  • [23] A Roadmap to Quality Improvement Methodology (QIM) for IT and Non-IT Related Project: Factors Affecting the Adoption and Implementation of QIM
    Wong, Whee Yen
    Rajindran, Sindhu
    Lee, Chan Wai
    2018 IEEE CONFERENCE ON SYSTEMS, PROCESS AND CONTROL (ICSPC), 2018, : 153 - 158
  • [24] AN EMPIRICAL STUDY OF FACTORS AND COGNISANT MEASURES FOR PROJECT QUALITY IN THE DESIGN PHASE: A CASE OF BUILDING PROJECTS IN THE DEPARTMENT OF BUILDING AND ENGINEERING SERVICES OF BOTSWANA
    Dodoo, E. N. D.
    van Waveren, C. C.
    Chan, K-Y.
    SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2011, 22 (01): : 137 - 153
  • [25] Influence of innovation diffusion factors on non-users' adoption of digital banking services in the banking 4.0 era
    Shaikh, Imran Mehboob
    Amin, Hanudin
    INFORMATION DISCOVERY AND DELIVERY, 2025, 53 (01) : 12 - 21
  • [26] Planning Business concept value chain Building services engineering in basic geothermal hot and cold composite systems and cogeneration plants in the meat industry
    Kuon, Josef
    FLEISCHWIRTSCHAFT, 2011, 91 (02): : 32 - 33
  • [27] The Analysis of Non-economic Contributing Factors in Sustainable Development Capacity of Reservoir Migrants: A Case Study of Three Gorges Engineering Migration Project
    Chen Long
    Qiang Mao-shan
    Chen Wen-chao
    2014 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (ICMSE), 2014, : 1904 - 1910