RESOURCE SCHEDULING - COMPARING SIMULATED ANNEALING WITH CONSTRAINT PROGRAMMING

被引:0
|
作者
CRABTREE, IB
机构
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper compares two different approaches to optimisation problems. It attempts to determine which technique is best under which circumstance. On the one hand a solution-based approach was considered using simulated annealing, and on the other a state based approach using constraint propagation techniques and heuristic labelling. The aim is to show that where the problems have few constraints, the solution-based simulated annealing will perform well, but where the problems involve more constraints, then state-based constraint techniques are more appropriate.
引用
收藏
页码:121 / 127
页数:7
相关论文
共 50 条
  • [1] SIMULATED ANNEALING FOR RESOURCE-CONSTRAINED SCHEDULING
    JEFFCOAT, DE
    BULFIN, RL
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 70 (01) : 43 - 51
  • [2] Implementation of Constraint Programming and Simulated Annealing for Examination Timetabling Problem
    June, Tan Li
    Obit, Joe H.
    Leau, Yu-Beng
    Bolongkikit, Jetol
    [J]. COMPUTATIONAL SCIENCE AND TECHNOLOGY, 2019, 481 : 175 - 184
  • [3] Resource-constrained project scheduling by simulated annealing
    Boctor, FF
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (08) : 2335 - 2351
  • [4] Constraint programming approach to tool allocation and resource scheduling in FMS
    Quiroga, O
    Zeballos, L
    Henning, G
    [J]. 2005 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION (ICRA), VOLS 1-4, 2005, : 3715 - 3720
  • [5] A simulated annealing algorithm for resource constrained project scheduling problems
    Cho, JH
    Kim, YD
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1997, 48 (07) : 736 - 744
  • [6] A Research on Scheduling Model of Simulated Annealing Algorithm based on Integer Programming
    Yan, Yaning
    [J]. PROCEEDINGS OF THE 2016 JOINT INTERNATIONAL INFORMATION TECHNOLOGY, MECHANICAL AND ELECTRONIC ENGINEERING, 2016, 59 : 347 - 352
  • [7] A constraint programming approach for the resource-constrained project scheduling problem
    Liess, Olivier
    Michelon, Philippe
    [J]. ANNALS OF OPERATIONS RESEARCH, 2008, 157 (01) : 25 - 36
  • [8] A constraint programming approach for the resource-constrained project scheduling problem
    Olivier Liess
    Philippe Michelon
    [J]. Annals of Operations Research, 2008, 157 : 25 - 36
  • [9] A Constraint Integer Programming Approach for Resource-Constrained Project Scheduling
    Berthold, Timo
    Heinz, Stefan
    Luebbecke, Marco E.
    Moehring, Rolf H.
    Schulz, Jens
    [J]. INTEGRATION OF AI AND OR TECHNIQUES IN CONSTRAINT PROGRAMMING FOR COMBINATORIAL OPTIMIZATION PROBLEMS, 2010, 6140 : 313 - +
  • [10] Solving dynamic resource constraint project scheduling problems using new constraint programming tools
    Elkhyari, A
    Guéret, C
    Jussien, N
    [J]. PRACTICE AND THEORY OF AUTOMATED TIMETABLING IV, 2003, 2740 : 39 - 59