共 50 条
- [4] Improving the ship design, acquisition and construction process Naval Engineers Journal, 1992, 104 (02): : 39 - 57
- [5] ESTIMATING THE ACQUISITION COST OF AN INITIAL LUNAR BASE ZEITSCHRIFT FUR FLUGWISSENSCHAFTEN UND WELTRAUMFORSCHUNG, 1991, 15 (05): : 327 - 332