IMPROVING THE SHIP DESIGN, ACQUISITION AND CONSTRUCTION PROCESS

被引:0
|
作者
RYAN, JC
JONS, OP
机构
关键词
D O I
10.1111/j.1559-3584.1992.tb00723.x
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
In the spring of 1990, the NavSea Chief Engineer initiated a project to improve the design, acquisition and construction (DAC) of U.S. Navy ships. The project's objectives are to reduce the time and cost of acquiring and operating Navy ships while improving their quality, unlike previous studies on the subject, the project utilizes a rigorous process analysis approach and attempts to use quantitative measures as the basis for recommending improvements. The paper is, of necessity, a status report on the progress of this project. Topics covered include: the DAC process; a look at the current state of ship acquisition time, cost, and quality; the methodology for process improvements; and early findings.
引用
收藏
页码:39 / 57
页数:19
相关论文
共 50 条
  • [1] Improving the ship design, acquisition and construction process
    Ryan, J.Christopher
    Jons, Otto P.
    Naval Engineers Journal, 1992, 104 (02): : 39 - 57
  • [2] Improving ship design process to enhance ship recycling
    Jain, K. P.
    Pruyn, J. F. J.
    Hopman, J. J.
    MARITIME TECHNOLOGY AND ENGINEERING 3, VOLS 1-2, 2016, : 663 - 671
  • [3] Concurrent treatment of safety aspects in ship design and construction process
    Maccari, Alessandro
    TRANSPORT RESEARCH ARENA 2012, 2012, 48 : 95 - 105
  • [4] Innovation in ship design and construction
    Anon
    Welding Review International, 1995, 14 (04):
  • [5] Architectonic patterns directed design: Improving software construction process
    Fernandez Lanvin, D
    Castanedo, RI
    Fuente, AAJ
    Lovelle, JMC
    IC-AI '04 & MLMTA'04 , VOL 1 AND 2, PROCEEDINGS, 2004, : 43 - 49
  • [6] Methodology for the ship exploitation feedback inclusion for improving the ship design and production process based on adjusted QFD method
    Hadjina, Marko
    Matulja, Tin
    Rubesa, Rajko
    POMORSTVO-SCIENTIFIC JOURNAL OF MARITIME RESEARCH, 2015, 29 (02) : 107 - 114
  • [7] PHILOSOPHY OF NAVAL SHIP DESIGN AND CONSTRUCTION
    SPERO, JR
    HICKS, WF
    GREENE, DL
    NAVAL ENGINEERS JOURNAL, 1971, 83 (05) : 45 - &
  • [8] EVOLVING INTO THE FUTURE OF SHIP CONSTRUCTION AND DESIGN
    DINSMORE, RP
    MARINE TECHNOLOGY SOCIETY JOURNAL, 1994, 28 (04) : 68 - 68
  • [9] The process protocol: Improving the front end of the design and construction process for the UK industry.
    Kagioglou, M
    Cooper, R
    Aouad, G
    Hinks, J
    PROFITABLE PARTNERING IN CONSTRUCTION PROCUREMENT, 1999, : 361 - 371
  • [10] THE IMPACT OF THE RESIDENT'S PARTICIPATION IN IMPROVING DESIGN AND HOME CONSTRUCTION PROCESS
    Manesh, Ali Behrad
    Azizi, Esfandiar
    TURKISH ONLINE JOURNAL OF DESIGN ART AND COMMUNICATION, 2016, 6 : 2109 - 2116