Economics of on-site vs. off-site fabrication of rebar

被引:22
|
作者
Polat, Gul [1 ]
Arditi, David [2 ]
Ballard, Glenn [3 ]
Mungen, Ugur [1 ]
机构
[1] Istanbul Tech Univ, Fac Civil Engn, Istanbul, Turkey
[2] Illinois Inst Technol, Dept Civil & Architectural Engn, Chicago, IL 60616 USA
[3] Univ Calif Berkeley, Dept Civil & Environm Engn, Berkeley, CA 94720 USA
关键词
Lean construction; cut and bent rebar; on-site fabrication; off-site fabrication; simulation model;
D O I
10.1080/01446190500529432
中图分类号
F [经济];
学科分类号
02 ;
摘要
Many contractors prefer on-site fabrication of rebar while others find that off-site fabrication is more advantageous. The economics of on-site and off-site fabrication of rebar need to be compared on the basis of several factors that include the project environment, wages, labour considerations, the initial investment for equipment, waste of rebar, the cost of inventory, cycle time, and supply chain management. This study presents an economic comparison of the on-site and off-site fabrication practices of rebar by means of a simulation model that makes use of the factors mentioned earlier. The model is populated with actual data obtained from a trade centre project in Istanbul, Turkey. The article indicates that the off-site fabrication practice would have been more costly than the on-site practice in the project in Istanbul, a finding that was to be expected in circumstances that prevail in most developing countries.
引用
收藏
页码:1185 / 1198
页数:14
相关论文
共 50 条
  • [1] Synchronising Off-Site Fabrication with On-Site Production in Construction
    Mossman, Alan
    Sarhan, Saad
    [J]. CONSTRUCTION ECONOMICS AND BUILDING, 2021, 21 (03): : 122 - 141
  • [2] ON-SITE VS OFF-SITE WASTE-DISPOSAL
    HOLLOWAY, FM
    [J]. POLLUTION ENGINEERING, 1984, 16 (09) : 28 - 30
  • [3] ECONOMICS OF OFF-SITE EROSION
    GUNTERMANN, KL
    LEE, MT
    SWANSON, ER
    [J]. ANNALS OF REGIONAL SCIENCE, 1976, 10 (03): : 117 - 126
  • [4] Comparison of on-site and off-site evaluations of dosimetry data
    BenComo, JA
    Followill, DS
    Cho, SH
    Balter, P
    Tailor, RC
    Lowenstein, JR
    Hernandez, N
    Hanson, WF
    [J]. PROCEEDINGS OF THE 22ND ANNUAL INTERNATIONAL CONFERENCE OF THE IEEE ENGINEERING IN MEDICINE AND BIOLOGY SOCIETY, VOLS 1-4, 2000, 22 : 1235 - 1238
  • [5] On-site or off-site treatment of medical waste: a challenge
    Hassan Taghipour
    Taher Mohammadyarei
    Mohamad Asghari Jafarabadi
    Ahmad Asl Hashemi
    [J]. Journal of Environmental Health Science and Engineering, 12
  • [6] On-site or off-site treatment of medical waste: a challenge
    Taghipour, Hassan
    Mohammadyarei, Taher
    Jafarabadi, Mohamad Asghari
    Hashemi, Ahmad Asl
    [J]. JOURNAL OF ENVIRONMENTAL HEALTH SCIENCE AND ENGINEERING, 2014, 12
  • [7] Collaborative Scheduling of On-Site and Off-Site Operations in Prefabrication
    Chen, Wei
    Zhao, Ying
    Yu, Yangqing
    Chen, Kaiman
    Arashpour, Mehrdad
    [J]. SUSTAINABILITY, 2020, 12 (21) : 1 - 23
  • [8] On-site optimal experiences and their relationship to off-site benefits
    Walker, GJ
    Hull, RB
    Roggenbuck, JW
    [J]. JOURNAL OF LEISURE RESEARCH, 1998, 30 (04) : 453 - 471
  • [9] A Sustainability Assessment Framework for On-Site and Off-Site Construction Logistics
    Brusselaers, Nicolas
    Fufa, Selamawit Mamo
    Mommens, Koen
    [J]. SUSTAINABILITY, 2022, 14 (14)
  • [10] Amplifying Off-Site Purchases with On-Site Retail Media Advertising
    Zenetti, German
    Pauwels, Koen
    [J]. JOURNAL OF INTERACTIVE MARKETING, 2024,