共 50 条
- [1] ALARA CONSIDERATIONS FOR STEAM-GENERATOR REPLACEMENT OPERATIONS [J]. HEALTH PHYSICS, 1983, 45 (01): : 210 - 210
- [2] STEAM-GENERATOR REPLACEMENT AT SURRY POWER-STATION - ALARA ASPECTS [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1981, 39 : 824 - 824
- [3] ALARA ACHIEVEMENTS DURING THE 1984 ROBINSON,H.B. STEAM-GENERATOR REPLACEMENT PROJECT [J]. HEALTH PHYSICS, 1985, 49 (01): : 128 - 128
- [4] KEEPING DOSES DOWN DURING STEAM-GENERATOR SERVICING [J]. NUCLEAR ENGINEERING INTERNATIONAL, 1989, 34 (416): : 50 - 56
- [5] PLANNING FOR STEAM-GENERATOR REPLACEMENT [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1983, 44 : 498 - 500
- [6] DEVELOPMENTS IN MAINTAINING STEAM-GENERATOR AVAILABILITY [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1979, 32 (JUN): : 686 - 687
- [7] THE CHALLENGES OF STEAM-GENERATOR REPLACEMENT [J]. ATOMWIRTSCHAFT-ATOMTECHNIK, 1993, 38 (02): : 118 - 121
- [8] ALARA AUDIT - RADIATION-DOSES AS LOW AS REASONABLY ACHIEVABLE [J]. HEALTH PHYSICS, 1980, 39 (06): : 1026 - 1027
- [9] RADIATION EXPOSURE MANAGEMENT FOR THE POINT BEACH STEAM-GENERATOR REPLACEMENT [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1985, 49 : 70 - 71
- [10] THE STEAM-GENERATOR REPLACEMENT COMES OF AGE [J]. NUCLEAR ENGINEERING INTERNATIONAL, 1991, 36 (444): : 23 - &