共 50 条
- [1] STEAM-GENERATOR REPLACEMENT AT SURRY POWER-STATION - ALARA ASPECTS [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1981, 39 : 824 - 824
- [2] A CONTRACTORS CONTRIBUTION TO MAINTAINING RADIATION-DOSES ALARA DURING STEAM-GENERATOR REPLACEMENT [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1983, 45 : 531 - 532
- [3] PLANNING FOR STEAM-GENERATOR REPLACEMENT [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1983, 44 : 498 - 500
- [4] THE CHALLENGES OF STEAM-GENERATOR REPLACEMENT [J]. ATOMWIRTSCHAFT-ATOMTECHNIK, 1993, 38 (02): : 118 - 121
- [5] ALARA ACHIEVEMENTS DURING THE 1984 ROBINSON,H.B. STEAM-GENERATOR REPLACEMENT PROJECT [J]. HEALTH PHYSICS, 1985, 49 (01): : 128 - 128
- [6] THE STEAM-GENERATOR REPLACEMENT COMES OF AGE [J]. NUCLEAR ENGINEERING INTERNATIONAL, 1991, 36 (444): : 23 - &
- [7] FRANCE PREPARES FOR STEAM-GENERATOR REPLACEMENT [J]. NUCLEAR ENGINEERING INTERNATIONAL, 1985, 30 (376): : 45 - 47
- [8] INTERNATIONAL EXAMPLES OF STEAM-GENERATOR REPLACEMENT [J]. ATOMWIRTSCHAFT-ATOMTECHNIK, 1993, 38 (02): : 122 - 125
- [10] THERMAL AND MECHANICAL CUTTING AND WELD PREP OPERATIONS IN STEAM-GENERATOR REPLACEMENT PROJECTS [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1983, 44 : 495 - 496