Seismic design of a steel-concrete hybrid cable-stayed bridge - the Shin-Minato bridge

被引:0
|
作者
Yoshinaga, Hiroshi [1 ]
Ymanouchi, Tetsuya [1 ]
Goto, Yoshio [1 ]
Nagai, Masatsugu [2 ]
机构
[1] Minist Land Infrastruct Transport & Tourism, Niigata Port & Airport Tech Res Off, Niigata, Japan
[2] Nagaoka Univ Technol, Dept Civil & Environm Engn, Niigata, Japan
来源
关键词
cable-stayed bridge; earthquake; earthquake engineering; seismic isolation; seismic analysis; seismic design method; damping system;
D O I
10.1002/stco.200890010
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Toyama New Port is an important international port in the Hokuriku area facing the Sea of Japan, which is located near Toyama city, Toyama prefecture. Toyama city has a population of around 400 000, and is an important city in the Hokuriku area from the economic, culture and politics viewpoints. The port is an international multipurpose terminal and provides the berth for passenger ships and cargo ships transporting raw materials such as timber, coal etc. In order to attain smooth distribution of products from this international multipurpose terminal, the Ministry of Land, Infrastructure & Transport is now in charge of constructing a harbor road connecting the east and west sides of the port. This harbor road links the left bank (Kaiou-machi, Izumi city) and the right bank (Kairyu-machi, Izumi city) of Toyama New Port (see Fig. 1). The Shin-Minato Bridge, a cable-stayed structure, is located on the middle section of this road. In order to ensure safe navigation for large ships, a clearance exceeding 270 m wide and 47 m high is necessary. Therefore, a continuous cable-stayed bridge with steel-concrete hybrid main girder and steel towers was chosen. The center span of this cable-stayed bridge is 360 m long and the towers rise 127 m above sea level. The central span between the towers is a twin-box-type steel girder with an orthogonally stiffened steel deck; each side span girder comprises a three-cell PC box girder. Since the side spans are relatively short, a steel-concrete hybrid system was selected. This paper describes design issues relating to earthquake-resistant or earthquake-control design.
引用
收藏
页码:66 / U124
页数:5
相关论文
共 50 条
  • [21] Prediction Study on the Alignment of a Steel-Concrete Composite Beam Track Cable-Stayed Bridge
    Li, Xiaogang
    Luo, Haoran
    Ding, Peng
    Chen, Xiaohu
    Tan, Shulin
    [J]. BUILDINGS, 2023, 13 (04)
  • [22] DESIGN OF A CABLE-STAYED STEEL COMPOSITE BRIDGE.
    Svensson, Holger S.
    Christopher, Ben G.
    Saul, Reiner
    [J]. Journal of structural engineering New York, N.Y., 1986, 112 (03): : 489 - 504
  • [23] Construction of the hybrid cable-stayed bridge
    Kim, D. G.
    Kwon, H. C.
    Lee, K. J.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE-CYCLE OPTIMIZATION, 2010, : 3328 - 3333
  • [24] The effect of cable loosening on seismic response of a prestressed concrete cable-stayed bridge
    Wu, Q
    Takahashi, K
    Nakamura, S
    [J]. JOURNAL OF SOUND AND VIBRATION, 2003, 268 (01) : 71 - 84
  • [25] JAPANESE CABLE-STAYED BRIDGE DESIGN
    BURDEN, AR
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1991, 90 : 1021 - 1051
  • [26] Mechanical behavior of a novel steel-concrete joint in hybrid girder cable-stayed bridge (vol 57, 105239, 2023)
    Zhao, Lanting
    Pu, Guangning
    Yuan, Yangguang
    Guo, Qi
    Yu, Yongliang
    [J]. STRUCTURES, 2024, 62
  • [27] Cable-stayed bridge seismic fragility analysis
    [J]. Yuan, W. (yuan@tongji.edu.cn), 2013, Science Press (41):
  • [28] The concrete cable-stayed Helgeland bridge in Norway
    Svensson, HS
    Jordet, E
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 1996, 114 (02) : 54 - 63
  • [30] Seismic isolation retrofitting solution for an existing steel cable-stayed bridge
    Javanmardi, Ahad
    Ibrahim, Zainah
    Ghaedi, Khaled
    Khan, Niaz Bahadur
    Ghadim, Hamed Benisi
    [J]. PLOS ONE, 2018, 13 (07):